Laserfiche WebLink
<br /> <br />accurately measure high flow events. and USGS have developed a ranking of <br /> gages statewide that require flood <br /> hardening. The CWCB will continue to <br /> work with the DWR and USGS to complete <br /> this task in the corning years. <br />Update existing USGS gages, which are of interest to Satellite Data Collection Platforms, <br />the CWCB, with Satellite Monitoring equipment. These Pressure Transducers and other stream <br />gages are currently being operated and maintained by gaging equipment upgrades were purchased <br />the USGS through their co-op programs, however the and delivered to the USGS for installation. <br />sites do not have satellite telemetry capability, which Staff is working off of a list of gages that it <br />would aid the CWCB floodplain, Stream and Lake would like to see updated and will continue <br />Protection, Compact, and DSS programs. this proiect into 2002/2003. <br />Installation of new stream flow gages - both staff gages This project has been temporarily delayed <br />and fully equipped Satellite Monitoring Stations. while staff evaluates locations that are <br />Tentative sites include Hunter Creek, North Clear Creek, important for the CWCB floodplain, Stream <br />Cow Creek, and the Purgatoire River below the Trinidad and Lake Protection, Compact, and DSS <br />Project irrigated area at Patterson Crossing. These gages programs. The evaluation process is taking <br />will be installed by the USGS or DWR and will include longer than expected due to the development <br />funding for operation and maintenance for one year. of the Instream Flow component of the <br />CWCB will attempt to bring in other possible Decision Support System. However, the <br />stakeholders to share in the future O&M costs. CWCB continued operation of the Cochetopa <br /> Creek and Snowmass staff gages utilizing a <br /> small portion of the available funding. In <br /> additiou, the need for two new stream gages <br /> on Fourmile Creek, in Boulder County has <br /> been identified and equipment purchases and <br /> installation is scheduled for late sunnner or <br /> early fall of 2002. <br />Miscellaneous Equipment (Mapping Software updates, Miscellaneous equipment and software <br />Survey Equipment purchases and/or repairs, computer necessary for the operation of the CWCB <br />equipment and associated software) streamgaging program has been purchased <br /> and installed. This is a recurring cost as <br /> new equipment and software becomes <br /> I available and as the program expands. <br /> <br />Page 24 of31 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />