My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00234
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:24 PM
Creation date
10/4/2006 6:33:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2002
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />- <br /> <br />Plan.... [W]e are concerned that [they] may not execute the draft Quantification Settlement Agreement <br />[QSA] by December 31, 2002." <br /> <br />. <br /> <br />That agreement would settle respective allocations of Colorado River water between entities in <br />California. For decades, California has benefited from the use of water from the Colorado River <br />"surplus" to the demands ofthe other basin states, but as use in the other states has grown that surplus <br />has all but disappeared. <br /> <br />For more information about the hearing visit <br />http://resourcescommittee.house.gov/l07cong/water/2002iunI4/agenda.htm. <br /> <br />Upper Colorado River Commission Meeting: The Upper Colorado River Commission met on June 4 <br />in Silverthorne. In addition to receiving the normal reports from federal agencies and reviewing the <br />budget, the Commission spent considerable time discussing the Navajo-Gallup Project and issues <br />associated with the use and export of water from the Upper Colorado River Basin to the Lower Colorado <br />River Basin. The Commission also received a brief update on the Three-Forks Ranch-Little Snake <br />Litigation. <br /> <br />Colorado River Salinity Control Forum Meeting: The Colorado River Salinity Control Forum also <br />met in Silverthorne on June 4, 5, and 6. The Workgroup met on June 4, with the primary item of <br />business being revisions to Reclamation's RiverWare model of the Colorado River and in particular, the <br />salt balance portion of the model. The primary item of business at the Forum meeting was approval of <br />the 2002 Triennial Review for public distribution. This triennial review is notable given the <br />considerable updates and revisions to the NPDES permit policies. The Forum also received the <br />responses of the federal agencies to the recent Advisory Council Report and set the budget for the next <br />two years. Colorado's dues next year will be $30,602. On June 6 the Forum toured salinity features in . <br />the Glenwood Springs area. <br /> <br />Other Salinity Control Program Issues: <br /> <br />. 2002 Triennial Review. The Clean Water Act requires that a review of existing water quality <br />standards be conducted every 3 Years. The CRBSC Forum conducts the triennial review of <br />salinity standards for the Colorado River Basin on behalf of the 7 basin states. The standards <br />consist of numeric criteria at 3 lower basin measuring points, a plan of implementation for <br />salinity control projects, and salt discharge policies for the states to enforce as they administer <br />their NPDES permit program. Normally during the review modeling forecasts of future salinity <br />levels in the lower basin are made and the plan of implementation is modified to achieve the <br />necessary level of salinity control to avoid exceeding the numeric criteria. This review is being <br />conducted without the benefit of a functioning model and the proposed salinity reduction targets <br />are instead based on past [1999 and 1996] reviews and a short-term goal of maintaining current, <br />rather than the maximum allowed, salinity levels in the lower basin. This conservative, low risk <br />path was chosen to avoid major swings in the program when model runs can again be made with <br />Reclamation's improved CRSS beginning in 2003. The principal change proposed in the 2002 <br />Review is a tightening of the salt discharge policies to prevent numerous small discharges [such <br />as those from multiple coalbed methane gas wells] from a single industrial owner from <br />qualifying for the de minimis exemption [lton/day 365 tons/year] under the existing policies. <br />This change was drafted by a Forum Committee chaired by David Holm of the CDPHE and is <br />suitable for enforcement in Colorado. The 2002 Review report will be available and distributed <br />to interested parties by late July. Public Meetings to discuss the review will be held at selected <br />locations in the upper and lower basin - Colorado will host a public meeting in Montrose on . <br /> <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.