My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00229
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:17 PM
Creation date
10/4/2006 6:33:44 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
CF Section - FL Gill H20 LLC
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~( <br />e <br /> <br />. <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Deoartment of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.cQ.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />TO: <br /> <br />Greg E, Walcher <br />Executive Director <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: <br /> <br />John Van Sciver, P.E. _7WV <br />Mike Serlet, P.E., Chie(--p/ f <br />Water Supply Planning aniFTnance Section. <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: March 2, 2004 <br /> <br />SUBJECT: Agenda Item 25d., March 16-17,2004 Board Meeting <br />FL Gill H20 LLC <br /> <br />Introduction <br />The FL Gill H20 LLC (FGH LLC) is applying for a $114,750 loan to construct a groundwater <br />recharge I well augmentation project and purchase water rights. The estimated total cost of the <br />project is $127,500. Please see the attached project summary and map. <br /> <br />Backaround <br />The FGH LLC, located in Washington County, consists of the owners of 3 contiguous farms under <br />the Johnson and Edwards Ditch, with a combined irrigated acreage of 910 acres. In November <br />2003 the CWCB approved a loan to the Johnson and Edwards Ditch to construct a well <br />augmentation project. However, the shareholders of the ditch voted to not proceed with the loan, <br />and staff has received a letter requesting that that loan be deauthorized. In spite of this, the need <br />to augment junior wells remains, leading to the formation of the FGH LLC and a proposal to <br />construct an alternative project. <br /> <br />There are 4 junior wells under the FGH LLC, used as a supplemental supply to the ditch water. <br />The depletions from the pumping of the FGH LLC wells must be replaced during times when <br />there is a "call" on the river by a senior downstream water right. GASP has successfully been <br />used for the past 30 years to cover the depletions on these wells. However, GASP operates on <br />a year-to-year basis with no guarantee of continued coverage, The recent drought has brought <br />to the foreground just how difficult it is to provide adequate augmentation for well users. GASP <br />has indicated it will not be able to provide augmentation of these wells. <br /> <br />The FGH LLC wants to develop a recharge system that will generate augmentation credits to <br />be used to offset the depletions caused by their 4 wells, By generating their own augmentation <br />the FGH LLC members can protect themselves from curtailment. <br /> <br />Feasibilitv Studies <br />Brent Nation, P,E, of Nation Engineering Services, has completed the feasibility study. The report <br />includes an evaluation of alternatives available to generate an augmentation supply for the FGH <br />LLC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.