Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />construction of flood prevention works on the channel of the South <br /> <br />Platte River from Denver to Fo~t Morgan, Colorado and the Board <br /> <br />agrees to provide or assist in the organization of a responsible <br /> <br />legal entity to sponsor the local cooperation requirements prior to <br /> <br />initiation of the construction of such facilities; and <br /> <br />BE IT FURTHER RESOLVED that as an intermediate measure <br /> <br />the Corps of Engineers be required to initiate further snagging and <br /> <br />clearing projects along the South Platte River and its downstream <br /> <br />tributaries as authorized by the Flood Control Act of 1937, and that <br /> <br />emergency bank protection works be constructed as required under the <br /> <br />authorization of the Flood Control Acts of 1944 and 1946; and <br /> <br />BE IT FURTHER RESOLVED that the Secretary of this Board <br /> <br />is directed to send a certified copy of this resolution to the <br /> <br />District Engineer of the United States Army corps of Engineers at <br /> <br />Omaha, Nebraska, and to each of Colorado's elected representatives <br /> <br />and senators in the United States Congress. <br /> <br />c ~ R T ~ F ~ C ~ T ~ <br /> <br />I certify that the foregoing is a true and correct copy <br /> <br />of a resolution adopted by a majority vote of the members of the <br /> <br />Colorado Water Conservation BOard in regular session assembled at <br /> <br />Denver, Colorado, on the lst day of April, 1970. <br /> <br />V~c/K~-- <br /> <br />FELIX L. SPARK Secretary <br />