My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00222
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:11 PM
Creation date
10/4/2006 6:33:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/22/1999
Description
CF Section - Loan De-Authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NaV-11-99 10:46 AM TRENT J TAYLOR <br /> <br />970566::;495 <br /> <br />P..03 <br /> <br />e <br /> <br />Redmesa's reservoir enlargement is part of this study, along with <br />other potential reservoir sites and possibilities for a domestic <br />water system. This study will be completed in Hay, 2000. We <br />feel this study will shed some light on Redmesa's possible future <br />in the overall water situation in our region. If this project is <br />viewed as part of a regional water management plan, the public <br />perception of the project will be much better. <br /> <br />Many events have transpired since obtaining our permit in 1997 <br />which have prevented us from proceeding with the project, <br />nevertheless, we plan to move forward in the next few months with <br />the following items: <br /> <br />1. We will obtain the services of a water attorney to review <br />the winter water rights issues (livestock water vs. storage <br />water) on the La Plata River, and work with the other water <br />users, their attorney and the court if necessary to resolve <br />them. <br /> <br />e <br /> <br />2. We will review the 1995 feasibility study done by Harris <br />Water Engineering and make whatever changes and or <br />corrections may be necessary. Financial feasibility will be <br />reviewed and updated in this process. A final determination <br />of feasibility will be made by September 30, 2000. <br /> <br />We feel that upon completion of the above mentioned items by <br />November, 2000, we all will have a better idea of whether this <br />project should continue or not. <br /> <br />Thank you for your patience and consideration. <br /> <br />Sincerely, J ~ <br /> <br />.':!:::t,7j <br /> <br />Vice President <br />Redmesa Ward Reservoir and <br />Ditch Company <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.