My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00221
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:10 PM
Creation date
10/4/2006 6:33:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
ISF Section - New Loans Surface Creek Ditch and Reservoir Company - Hotel Twin Reservoir Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Surface Creek Ditch & Reservoir Company - Dam Rehabilitation <br />November 25-26, 2002 . <br /> <br />Agenda item 200 <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Surface Creek Ditch and <br />Reservoir Company <br /> <br />County: Delta <br /> <br />Project Name: Hotel Twin Reservoir <br /> <br />Project Type: Dam Rehabilitation <br /> <br />Drainage Basin: Gunnison <br /> <br />Water Source: Ward Creek <br /> <br />Total Project Cost: $363,500 <br /> <br />Funding Sources: eWCS <br /> <br />Type of Borrower: Agricultural/Municipal (Low) Aver. Delivery: 436 acre-feet <br /> <br />CWCB Small Project Loan: $265,000 <br /> <br />interest Rate: 2.80% <br /> <br />Term: 30 years <br /> <br />SCD & RC operates a system of reservoirs on Grand Mesa in Delta County, providing agricultural <br />irrigation water to 2384 acres in aserviee are;a of 6000 acres in and around the town of Cedaredge. <br />Hotel Twin Reservoir and Dam is a Class 1 Dam with a capacity of 549 aere-ft and a 35 acre <br />surface area. The dam height is21.0 feElt with a crest length of.255 feet. The dam has a history of <br />seepage problems dating back to the early 1990's with several temporary repairs undertaken. <br />Following the end of the 2001 irrigation season seD & RC initiated geo-technical investigations on <br />the dam. In January 2002, as a result of removal of the entire downstre;am shell of the <br />embankment, the SEO issued a zero storage restriction until all repairs are completed. Due to the <br />discovery of significant unsuitable material and voids, the dam is being rebuilt essentially from the <br />ground up, with a fairly typical dam rehabilitation design in that it will include a chimney drain, <br />blanket drain and toe drain. The USFS has a road over the top of the dam that is being widened <br />from 24' to 30 feet. The existing outlet works is being retained but a new service spillway pipe (100- <br />year design) is being installed. The emergency spillway is an area on the left embankment where <br />water would flow over the roadway. <br /> <br /> <br />f,;....'v...... ." <br /> <br />.'~";::::7';U <br />.. <br /> <br />Location Map <br /> <br />t <br /> <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.