Laserfiche WebLink
<br />The product of this task will be a summary report (5 copies) identifying the issues <br />. identified in the meeting and the intended resolution. <br /> <br />6} Development of Construction Documents to 90% level. <br /> <br />This task represents the further development of the construction documents with focus <br />given to addressing CDOW comments on the 30% submittal, changes resulting from <br />the Value Engineering Process and the development of those details necessary to <br />convey the construction requirements to a construction contractor. <br /> <br />As a part of this task the Geotechnical Engineer will review the appropriate plans and <br />specifications relative to their understanding of the final project configuration and the <br />incorporation of their recommendations into the construction documents. <br /> <br />Products developed under this task will include half size (11" by 17") drawings (an <br />anticipated sheet count and makeup of the drawing submittal is shown in the fee <br />estimate for this task), a final drainage report and plan (if required), a final Operational <br />Considerations Report, a draft of the technical specifications and an updated opinion of <br />probable construction cost. <br /> <br />Five copies of the package will be submitted to CDOW in advance of a review meeting <br />to be held with CDOW in Denver. This meeting will be attended by two representatives <br />of FishPro, Inc. with other team members available by telephone. <br /> <br />. <br /> <br />7} Final Construction Documents <br /> <br />This task will involve the development of the final construction documents and will <br />focus on addressing the comments received on the 90% submittal as well as any <br />received during a final QAlQC review performed by FishPro. <br /> <br />The products produced under this task for submittal to CDOW will include final, sealed, <br />drawings, final technical specifications, a collection of catalog "cut" sheets (to assist <br />with submittal reviews during construction), an updated opinion. of probable <br />construction costs and a design summary report. We anticipate providing one set of <br />original mylars (assumed size 22" by 34"), one set of half size (11" by 17") originals, 5 <br />half size drawing sets, one original set of technical specifications, 5 bound sets of <br />technical specifications and 5 copies of the other documentation provided under this <br />task. <br /> <br />tI <br />