My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00212
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:06 PM
Creation date
10/4/2006 6:33:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2002
Description
ISF Section - Authorization to Proceed to Trial - Durango/La Plata Airport, Case No. 7-99CW66
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of N aturaI Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX, (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />GovetTlor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />To: CWCB Members <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />From: Dan Merriman and Ted Kowalski <br /> <br />Date: May 2, 2002 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Agenda Item 19, May 20-21, 2002 Board Meeting -- <br />Stream and Lake Protection - Authorization to Proceed to Trial. Durango/La Plata <br />Airport, Case No. 7-99CW66 <br /> <br />Backl!round <br />The Durango/La Plata Airport ("DLP A" or "Applicant") has filed for a conditional surface water <br />right (Airport Pipeline), for two conditional storage water rights (Airport Phase I Reservoir and <br />Airport Phase II Reservoir, a change of water rights of the Tyner East Side Ditch, and for a plan for <br />augmentation. DLP A's augmentation plan seeks to permit the Applicant to make out-of-priority <br />diversions at the Airport Pipeline, and the Applicant will augment the depletions with releases from <br />the Airport Phase I and Airport Phase II Reservoirs. However, there is a segment of the Florida <br />River that will be depleted by the amount of the diversions at the Airport Pipeline and the Applicant <br />is unwilling to include a condition that when the CWCB's instream flow on the Florida River is not <br />satisfied, the Applicant shall curtail its diversions or replace its diversions at a point located at or <br />upstream of the point of the diversions. <br /> <br />The CWCB has two instream flow water rights on the Florida River. They are: 1) Case No. 7- <br />77W1763 for 7 cfs (7/1-10/14) and 14 cfs (10/15-6/30); and 2) Case No. 7-77WI764 for 12 cfs (7/1- <br />10/14) and 20 cfs (10/15-6/30), both with appropriation dates of 1/19/1977. <br /> <br />The trial is currently set for two days beginning June 24, 2002, in Durango. The Staff has explored <br />settlement with the Applicant, but has not been able to obtain a favorable settlement to date. The <br />Staff intends to continue to explore settlement options, but is asking for authorization to proceed to <br />trial should the negotiations not be successful. In fact, based on ongoing negotiations, staff may <br />present a settlement proposal to the Board at the meeting. <br /> <br />Staff Recommendation <br />It is recommended that the Board authorize the Staff to proceed to trial. However, staff should <br />continue Water Quality Forum to explore settlement options that will fully protect the CWCB's <br />instream flow water rights on the Florida River. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.