My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00211
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:06 PM
Creation date
10/4/2006 6:33:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
Summary Minutes and Record of Decisions - January 27-28, 1999
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />with any existing debt of the Company with respect to a pledge of revenues. <br />The motion was seconded by Janice Sheftel and approved (8-2). <br /> <br />13e. Water Project Construction Loan Program - New Loans - Pine River Canal Co.- <br />Tunnel Hill Project <br />Tape 3. Start/Stop: 1542 - 1851 <br />Action: Janice Sheftel recused herself from this item. A motion was made by David <br />Smith that the Board accept the staff recommendation for a loan not to <br />exceed $243.700. for a period of 20 years at a rate of 3.5%. upon acceptance <br />of a feasibility study. The motion was seconded by Ray Werner and <br />approved unanimously (9-0). <br /> <br />14a. Arkansas River Basin Issues - Arkansas Director's Report <br />Tape 3. Start/Stop: 1859 - 1874 <br />Action: This was an informational item; no action taken. <br /> <br />14a. Arkansas River Basin Issues - Arkansas River Conveyance and Rehabilitation <br />Project Continuation - Status Report <br />Tape 3. Start/Stop: 1874 - 1899 <br />Action: This was an informational item; no action taken. <br /> <br />15a. Platte River Basin Issues - Denver Director's Report <br />Tape 3. Start/Stop: 1899 - 1959 <br />Action: This was an informational item; no action taken. <br /> <br />15b. Platte River Basin Issues - N. Platte Director's Report <br />Tape 3. Start/Stop: 1959 - 1990 <br />Action: This was an informational item; no action taken. <br /> <br />15c. Platte River Basin Issues - S. Platte Director's Report <br />Tape 3. Start/Stop: 1990 - 2275 <br />Action: This was an informational item; no formal action taken. although in a <br />discussion of the U.S. Fish and Wildlife's proposed Rule 4(d) (dealing <br />with the Preble's Meadow Jumping Mouse). the Board voiced consensus <br />that all Board and agency comments should be coordinated through the <br />Department's Executive Office. <br /> <br />15d. Platte River Basin Issues - Chatfield Storage Space Reallocation - Status Report <br />Tape 3. Start/Stop: 2275 - 2308 <br />Action: This was an informational item; no action taken. <br /> <br />Minutes January 27-28,1999 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.