My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00211
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:06 PM
Creation date
10/4/2006 6:33:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
Summary Minutes and Record of Decisions - January 27-28, 1999
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Sa. - Floodplain Management - Floodplain Designation and Approvals - FPR Nos. 98-479. <br />d. 98-480.98-481 and 98-482 <br />Tape 1. Start/Stop: 1950 - 2400 <br />Action: These four items were discussed together. FPR 98-479 was tabled it so that <br />the County Commissioners could meet with staff. Regarding FPR 98-480. a <br />motion was made by Patricia Wells to accept the staff recommendation for <br />approval of this Flood Insurance Study. with the understanding that the Study <br />is outdated due to the amount of growth in the area. and with the addition that <br />the approval of the Study be conditional. dependent upon the Town of <br />Blackhawk completing an updated Flood Insurance Study within one year. <br />The motion was seconded simultaneously by Alan Hamel. Bill Brown and <br />Bob Burr and approved unanimously (9-0). Regarding FPR 98-481. a <br />motion was made by Bob Burr to approve the staff recommendation to <br />approve and designate the Resolution. The motion was seconded by David <br />Smith and approved unanimously (9-0). FPR 98-482. as tabled so that the <br />Town of Fleming could collect more information as needed. <br /> <br />4d. - Floodplain Management - Floodplain Designation and Approvals - FPR Nos. 98-475. <br />g. 98-476.98-477 and 98-478 <br />Tape 1. Start/Stop: 3082 - 3190 <br />Action: A motion was made by Eric KUbn to accept the staffrecommendation and to <br />approve the standard delineation in FPR No. 475. and that the Board rescind <br />the existing floodplain delineation in FPR Nos. 476. 477 and 478. The <br />motion was seconded by Bill Brown and approved unanimously (8-0). <br />6a. Instream Flow Program - New Appropriations - Phase III - Division 2 <br />Tape 1. Start/Stop: 2433 - 3028 <br />Action: This was an information item; no action taken. <br /> <br />7a. Instream Flow Program - Proposed Injury with Mitigation/Modification - Case No. 5- <br />97CW306 <br />Tape 1. Start/Stop: 3028 -4415 <br />Action: A motion was made by Patricia Wells that the Board accept the staff <br />recommendation that the Board determine that the "natural environment <br />could be preserved to a reasonable degree with the proposed injury or <br />interference if the applicant provided mitigation". and to encourage the <br />applicant and staff to work together to more fully evaluate the opportunities <br />that may be afforded under Alternative 4 as described in the applicant's <br />January 19. 1999 letter. The motion was seconded by Eric Kuhn and <br />approved unanimously (9-0). <br /> <br />7b. Instream Flow Program - Proposed Injury with Mitigation/Modification - Case No. 5- <br />97CW283 <br /> <br />Minutes January 27-28,1999 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.