Laserfiche WebLink
<br />;. <br /> <br />! <br /> <br />DRAFT <br /> <br />. <br /> <br />substitute stream flow forecasting source or method that will provide substantially <br />the same information,) The Forecast as of June I in any year shall determine the <br />effectiveness of the RICD for June 1 through September 30. <br /> <br />3) Any administrative call for the RICD shall be presumed futile during times when <br />UGRWCD's call for the water right will not in any event produce flows equal to <br />250 cfs, In addition, any administrative call for June and July that will not in any <br />event produce flows equal to 500 cfs shall be deemed a call for 250 cfs (should <br />the call be able to produce that amount), For example, if UGRWCD placed a call <br />during the month of June and that call resulted in 300 cfs being made available at <br />the RICD reach, UGRWCD's call would be presumed to be for 250 cfs. <br /> <br />4) Applicant shall install, maintain and monitor at locations determined by the <br />Division Engineer and at Applicant's expense such measuring devices deemed <br />necessary by the Division Engineer to administer the terms of this decree, <br /> <br />5) The RICD should be granted for recreational boating purposes only. <br /> <br />6) In order to prevent waste, any "call" by the UGRWCD for water to satisfy the <br />RICD will only be honored when a substantial number of persons are reasonably <br />anticipated to use the recreational boating course, <br /> <br />. <br /> <br />7) When flood control operations are in effect, or for other good <br />and sufficient reasons in an emergency situation, in the opinion of the State <br />Engineer, and the responsible governmental agencies have determined that a flow <br />of less than the RICD rate is necessary, the RICD will not receive releases from <br />any reservoirs in excess of that being released under flood control or other <br />emergency operations. <br /> <br />8) If the RICD structures result in icing conditions such that flooding upstream of <br />the RICD. and in particular in the West Branch of the Gunnison River, the <br />Applicant must take such measures to remedy the situation, including but not <br />limited to redesigning or removing the structures, <br /> <br />The Board reserves its right to address all other relevant lssuesbefore the water court <br /> <br />. <br /> <br />3 <br />