My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00182
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:29 PM
Creation date
10/4/2006 6:32:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2006
Description
CF Section - Construction Fund and Severance Tax Trust Fund Perpetual Base Account New Loans - Orchard Mesa Irrigation District - Stokes Gulch Siphon Replacement
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Orchard Mesa Irrigation District <br />March 13, 2006 <br />Page 3 of 4 <br /> <br />Agenda Item 17a <br /> <br />e <br /> <br />private property. This siphon is located on the Power Canal which is the oniy source of River fiows <br />to the power plant and the main source of water to the irrigators. The siphon has required numerous <br />repair efforts in the recent years and several areas are currently showing significant spailing and <br />exposed rebar. <br /> <br />The District has evaiuated four alternatives and deterrnined that the risk of a siphon faiiure is too <br />high and repair is needed. The District evaluated two primary options: repair or replace the Siphon. <br />Replacement was selected since repair would only prolong the need for repiacement. Two <br />construction techniques were evaiuated: Cast-in-place and Precast placement of the new 12ft x 12ft <br />concrete box sections. The precast option has been determined to be the most cost effective. <br />Alternatives evaluated are listed below: <br /> <br />1. Repair the Siphon <br />2. Replace the Siphon with cast-in-place concrete box sections <br />3. Replace the Siphon with precast concrete box sections <br />4. No Action <br /> <br />The District chose Alternative No.3 with a total Project cost estimate of $600,000 <br /> <br />Total <br /> <br />$385,000 <br />75,000 <br />140,000 <br />$600,000 <br /> <br />Construction <br />Planning/Engineering <br />Contingency (30%) <br /> <br />e Financial Analvsis <br /> <br />Table 1 shows a summary of the financial aspects of the Project for the loan request. A CWCS <br />Loan of $540,000 wiil have an annual debt service obligation of $28,380 ($25,800 for annual loan <br />payment and $2,580 for the 10% reserve funding) for the loan terms of 2.5% for 30-years. The <br />interest rate is based on the standard agricultural interest rate. The District wiil use cash available <br />for the remaining 10% of the Project costs that are not financed by CWCS. The total debt service <br />obligation for this Project represents an annual cost of $0.50/ac-ft of water delivered to District <br />lands. <br /> <br />Table 1. Financial Summary of Project <br /> <br />Total Project Cost . <br />CWCS Loan (90% of Total Project Cost) <br />CWCS Annual Loan Payment <br />CWCS Loan Obliqation (includinq 10% debt reserve fundinq) <br />Annual Assessment for Project Only (based on 9,206 acres) <br />Annual Project Cost per Acre-Foot delivered (based on 58,300 AF) <br /> <br />$600,000 <br />$540,000 <br />$25,800 <br />$28,380 <br />$3. 1 O/acre <br />$0.50/ac-ft <br /> <br />e <br /> <br />Creditworthiness: The District currently has a 1997 CWCS loan (C153723) for the Mutual Mesa <br />Ditch Lateral Rehabilitation Project. Current balance is $392,627 with annual payments of $27,169 <br />plus the 10% reserve funding. The District is current in the repayment and has been prompt with ail <br />payments. The District raised assessments in 2004 in anticipation of the capital improvements <br />needed on the water supply delivery system. As of December 2004, the District had $1.9 million in <br />cash reserves to begin a series of system improvements. Repayment of the loan wiil be <br />accomplished utilizing the current assessments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.