My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00177
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:25 PM
Creation date
10/4/2006 6:32:54 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2005
Description
ISF Section - Uncontested Streams Request to Delay Final Action
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Summary <br />The information contained in this report and the associated instream flow file folqer forms the <br />basis for staffs instream flow recommendation to be considered by the Board. It is staffs <br />opinion that the information contained in this report is sufficient to support the findings required <br />in Rule 5.40. <br /> <br />Colorado's Instream Flow Program was created in 1973 when the Colorado State Legislature <br />recognized "the need to correlate the activities of mankind with some reasonable preservation of <br />the natural environment" (see 37-92-102 (3) C.R.S.). The statute vests the CWCB with the <br />exclusive authority to appropriate and acquire instream flow and natural lake level water rights. <br />In order to encourage other entities to participate in Colorado's Instream Flow Program, the <br />statute directs the CWCB to request instream flow recommendations from other state and federal <br />agencies. The Bureau of Land Management recommended these segments of Escalante Creek to <br />the CWCB for inclusion into the Instream Flow Program. Escalante Creek is being considered <br />for inclusion into the Instream Flow Program because it has a natural environment that can be <br />preserved to a reasonable degree with an instream flow water right. The BLM is very interested <br />in protecting stream flows because Escalante Creek provides important spawning habitat for <br />sensitive fish species in the lower reach, and it sustains a salmonid fishery in the upper reach. <br /> <br />Escalante Creek is 17.9 miles long. It begins near Kelso Point at the confluence of the East and <br />Middle Forks at an elevation of approximately 6,300 feet and terminates at the confluence with <br />the Gunnison River at an elevation of approximately 4,800 feet. Escalante Creek is located <br />within Mesa, Montrose and Delta Counties. The total drainage area of the creek is <br />approximately 209 square miles. Escalante Creek generally flows in a northeasterly direction. <br /> <br />, <br /> <br />There are two stream segments addressed by this report. The first and upper segment of <br />Escalante Creek begins at the confluence of the East and Middle Forks and extends downstream <br />to the headgate of the Knob Hill Ditch. The second and lower segment begins at the confluence <br />with North Fork Escalante Creek and extends downstream to the headgate of the Captain H.A. <br />Smith Ditch. (see Maps Appendix D). The proposed segments are located southwest ofthe City <br />of Delta. The staff has received only" one recommendation for these-segments, from the BLM." <br />The recommendation for these segments is discussed below. ~ <br /> <br />.- <br /> <br />Instream Flow Recommendation(s) <br />For the upper reach, BLM recommended 11.5 cfs (April 1 to June 30), 3.2 cfs (July I to July 31), <br />1.3 cfs (August I to February 28), and 3.2 cfs (March I to March 31), based on data collection <br />efforts on June 17, 2003 and June 2, 2004. For the lower reach, BLM recommended 8.2 cfs <br />(April I to June 30), 4.0 cfs (July I to July 31),1.5 cfs (August I to Feb. 28),4.0 cfs (March I to <br />March 31), based on data collection efforts on June 17,2003 and June 2, 2004. The modeling <br />results from these survey efforts are within the confidence interval produced by the R2Cross <br />model. <br /> <br />Land Status Review <br /> <br /> Total Length Land Ownershio <br />Upper Terminus Lower Terminus (miles) % Private % Public <br />Confluence of East Headgate of Knob 3.9 9.6% 90.4% <br />and Middle Forks Hill Ditch <br />Confluence with Headgate of <br />North Fork Escalante Captain H.A. 6.4 11.7% 88.3% <br />Creek Smith Ditch <br /> <br />- 3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.