My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00159
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:02 PM
Creation date
10/4/2006 6:32:42 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
CF Section - New Financial Policy Review - Policy #17 - Application Approval and Use of the Grants from the Feasibility Study Small Grant Fund
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f <br /> <br />. POLICY NUMBER: 17 <br /> <br />SUBJECT: <br /> <br />APPLICATION APPROVAL AND USE OF GRANTS FROM <br />THE FEASIBILITY STUDY SMALL GRANT FUND <br /> <br />EFFECTNE DATE: January 28, 2004 <br /> <br />POLICY: <br /> <br />The Colorado Water Conservation Board (CWCB) will accept <br />applications for grants from the Feasibility Study Small Grant <br />Fund (the Fund) at any time during the year, <br /> <br />The CWCB will review grant applications from the Fund for water <br />project feasibility studies that meet the established goals and loan <br />program needs of the CWCB Construction Fund and Severance <br />Tax Trust Fund Perpetual Base Account. <br /> <br />All grants from the fund will be limited to fifty percent of the total <br />study cost. The CWCB Director has the authority to approve <br />grants for up to $5,000 without prior Board authorization, The <br />applicant must complete the project feasibility study within one <br />year of the approval date. <br /> <br />. <br /> <br />Eligible study costs will include: <br />a, Studv oreuaration costs, <br />b, Engineering costs including surveying, preliminary <br />design, geo-technical analysis of foundation <br />conditions, and the design report. <br />c. Appraisal costs when an appraisal is required for the <br />loan, <br />d. Financial audit costs when no financial information <br />currently exists, <br /> <br />PURPOSE: <br /> <br />To establish an application and approval process for grants from <br />the Feasibility Study Small Grant Fund. <br /> <br />APPLICABILITY: <br /> <br />This policy and procedure apply to grant applications from the <br />Feasibility Study Small Grant Fund, <br /> <br />PROCEDURE: <br /> <br />A grant applicant will submit the following to the CWCB staff for <br />review: <br />a, A letter of request for the grant. The letter must <br />state that the feasibility study will be in the CWCB <br />format, and that the applicant plans to apply for a <br />loan from the CWCB and has selected an engineer <br />to complete the study, <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.