My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00155
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:45:58 PM
Creation date
10/4/2006 6:32:39 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
Summary Minutes and Record of Decisions - September 21-22, 1998
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />such designation even if the current $200 million nationwide EQlP budget is <br />not enlarged to provide additional funds for such areas, provided that any - <br />such national priority areas are funded "off the top" at a national level. The . <br />motion was seconded by Ray Werner and approved unanimously (7-0). <br />Note: There was some informal discussion of this item after Item 18d. <br /> <br />26i. Colorado River Basin Issues - IS-Mile Reach ESA Section 7 Consultation <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This was an informational item; no presentation made and no action taken. <br /> <br />20j, Colorado River Basin Issues - Ruedi Reservoir Round II Contracts and Annual <br />Contract for Endangered Fish <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This was an informational item; no presentation made and no actions taken. <br /> <br />20k. Colorado River Basin Issues - Yampa Operation and Management Plan <br />Tape 3, Start/Stop: 0000- 0000 <br />Action: This was an informational item; no presentation made and no action taken. <br /> <br />201. Colorado River Basin Issues - Colorado River Annual Operating Plan and Glen <br />Canyon Dam Operations <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This was an informational item; no presentation made and no action taken. <br /> <br />. <br /> <br />20m. Colorado River Basin Issues - Glen Canyon Dam Adaptive Management Workgroup <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This was.an informational item; no presentation made and no action taken. <br /> <br />20n. Colorado River Basin Issues - Lower Colorado Rule Allowing Offstream Storage <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This was an informational item; no presentation made and no action taken, <br /> <br />Adjourn: 2:00 p.m. <br /> <br />L:\boardmem\Sept98\September98min.doc <br />11/03/98 <br /> <br />Minutes September 21-22, 1998 <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.