Laserfiche WebLink
<br />15. <br /> <br />" <br /> <br />d. State Engineer <br />e. Division of Wildlife <br />f. Water Resource and Power Development Authority <br />Tape 3, Track I 19:00 - 1:20:19 <br />Action: Information item. No formal action taken. <br /> <br />. <br /> <br />Basin Directors' Reports <br />a. Colorado River (Mainstem) Basin Director's Report <br />b. Yampa-White River Basin Director's Report <br />c. San Juan/San Miguel-Dolores River Basin Director's Report <br />d. Gunnison River Basin Director's Report <br />e. Denver Director's Report <br />f. North Platte River Basin Director's Report <br />g. South Platte River Basin Director's Report <br />h. Rio Grande Basin Director's Report <br />i. Arkansas River Basin Director's Report <br />Tape 3, Track I 1:20:19-2:31:19 <br />Action: Information item. No formal action taken. <br /> <br />16. <br /> <br />~:+"of.~ III <br />Flood Protection - South Platte Downstream Channel Improvement Project -~ <br />Tape3,Trackl 2:31:19-2:37:40 "Ol.? . <br />Action: A motion was made by Don Schwindt with a b ay Wright to approve staff <br />recommendation that the Board approve th istri s re uest for the construction of <br />a path/trail subject to the requirements and con lIOns ofthe May 5, 1997 contract <br />and additional conditions set forth within the CWCB right-of-way under Method III <br />fee consideration. The Method III fee consideration for this request is "no charge". <br />Staff is authorized to prepare the necessary contract / easement documents and the <br />Director to execute said documents. It should be further recommended that the <br />grantee should replace and reclaim all existing easement / Project features. It is <br />further recommended that the District install proper signing for the path / trail system <br />to protect the public safety for the path / trail system to protect the public safety of <br />project land users. <br />Motion is approved 10 - O. <br /> <br />. <br /> <br />17. <br /> <br />Flood Protection - Alamosa River Watershed Restoration Master Plan <br />Tape 3, Track I 2:37:40 - 2:52:07 <br />Action: Information item. No formal action taken. <br /> <br />18. <br /> <br />Flood Protection - Progress Report for the CWCB Stream and Watershed Restoration Program <br />a. Proposal for the Modernization of the CWCB Watershed Restoration Program <br />Tape 3, Track 1 2:52:07 - 3:03:30 <br />Action: Information item. No formal action taken. <br /> <br />b. Presentation on the National Perspective for Restoration Programs (8:30 - 9:00) <br />Tape 3, Track I 3:03:30 - 3:09:40 <br />Action: Information item. No formal action taken. <br /> <br />19. 2002 Chatfield Drought Declaration Reconsideration <br />Tape 3, Track I 3:09:40 - 3:18:00 <br />Action: A motion was made by Barbara Biggs with a second by Eric Wilkinson to approve . <br />staff recommendation that the Board reconsider its November 26, 2002 "Severe and <br />Prolonged" Drought Declaration for Chatfield Reservoir and rescind said declaration <br />for the immediate future, It is further requested that the Board direct staff to send a <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />