My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00151
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:45:47 PM
Creation date
10/4/2006 6:32:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
Summary Minutes and Record of Decisions - September 14-15, 2004
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Voting tallies are based on members present for voting. Members recusing tbemselves are identified. Board members <br />occasionally leave the meeting, but the original meeting notes typically indicate whether or not a particular Board Member <br />was present during a specific agenda item. . <br />4. Water Supply Planning and Finance Section - New Loans <br />a. Mancos Valley Beaver Ditch Company - Mancos Valley Beaver Ditch Pipeline Project <br />T e1,Track1 3:10-24:25 <br />Action: A motion was made by Tom Sharp with a second by Harold Miskel to accept staff <br />recommendation for an initial loan, not to exce 413,000 for construction costs, to <br />the Mancos Val r ltC ompany from the Severance Tax Trust Fund <br />fl () Q.. O/' Perpe ase Account, for the Mancos Valley Beaver Ditch Pipeline Project. The <br />~ g ~ t:; ard also approved a post-construction loan not to exceed 107,100 ($103,000 for <br />project costs and 0 oan emce ee to the Company with terms <br />on e current agricultural rate (30 years at 2.5% per annum). Security for the <br />loan will be collateral in compliance with CWCB Loan Policy No.5. <br /> <br />, <br /> <br />!a'II <br /> <br /> <br /> <br />Final approval of the loan will also be conditioned upon the following: <br />I. Executed USDA Conservation Program Contract. <br />2. Company's Funding Agreement shall include a "step-up" provision. <br />3. All Standard contracting provisions of the CWCB Loan Program including a <br />revised Debt Service Reserve Fund Provision that requires two annual loan <br />payments (one payment set aside at the time of contract execution and one <br />third of an annual payment set aside at the time of each of the first three <br />annual loan payments. <br />Motion was approved 10 - O. <br /> <br />b. Lower Bauer West Lateral, Inc. - Lower Bauer Res. Outlet Pipeline Extension <br />pe I, Track 1 24:25 - 31:00 <br />Action: A motion was made by Ray Wright with a second by Bob Burr to approve the staff <br />recommendation for an initial loan, not to exceed $195,000 for construction costs, to <br />the Lower Bauer West Lateral, Inc. from the Severance Tax Trust Fund Perpetual <br />Base Account, for the Lower Bauer Reservoir Outlet Pipeline Extensions Project. <br />The Board also approves a post-construction loan not to exceed $50,700 ($48,750 for <br />project costs and $1,950 for the 1% Loan Service Fee) to the Company with terms <br />based on the current agricultural rate (30 years at 2.5% per annum). Security for the <br />loan will be collateral in compliance with CWCB Loan Policy No.5. <br /> <br />. <br /> <br />Final approval of the loan will also be conditioned upon the following: <br />1. Executed USDA Conservation Program Contract. <br />2. Company's Funding Agreement shall include a "step-up" provision. <br />3. All standard contracting provisions of the CWCB Loan Program including a <br />revised Debt Service Reserve Fund Provision that requires two annual loan <br />payments, one payment set aside at the time of contract execution and one <br />third of an annual payment set aside at the time of each of the first three <br />annual loan payments. <br />Motion was approved 10 - O. <br /> <br />c. Young Creek Reservoir Company - Young Cr. Reservoir #1-2 Rehabilitation <br />Tape 1, Track 1 31:00 - 46:25 <br />Action: A motion was made by Ray Wright with a second by Don Schwindt to approve staff <br />recommendation for a loan not to exceed $197,354 ($195,400 for project costs and <br />$1,954 for the 1% Loan Service Fee in accordance with CWCB Loan Policy #16) to . <br />the Young Creek Reservoir Company, from the Severance Tax Trust Fund Perpetual <br />Base Account, to perform initial rehabilitation on its Reservoir #1-2 dam, and to pay <br />expenses already incurred. The recommended terms of the loan are 30 years at 2.5% <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.