My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00143
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:45:36 PM
Creation date
10/4/2006 6:32:35 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CF Section - En-Bloc Non-Reimbursable Investment Recommendations CWCB/Division of Water Resources Satellite Monitoring System
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />satellite telemetry capability, which would aid the CWCB floodplain, Stream and Lake <br />Protection, Compact, and DSS programs. A list of gages that have been updated through this <br />ongoing project, as well as gages left to be updated has been compiled and is available for <br />review. <br />Installation of up to 6 new stream flow gages. <br />This project entails the installation of new staff gages, dataloggers and fully equipped Satellite <br />Monitoring Stations. These gages will be installed by the USGS, DWR or others and may <br />include funding for operation and maintenance for one year. CWCB will attempt to bring in <br />other stakeholders to share in the future O&M costs. This project will include the purchase of <br />four dataloggers to be placed in Boulder Creek to help monitor senior donated instream flow water <br />ri hts from the Ci of Boulder. <br />Gaging Related Equipment Purchases. <br />This funding is necessary to update and maintain equipment used for the Gaging Program and <br />to provide for ongoing staff training. Examples of ongoing purchases include mapping software <br />updates, survey and portable gaging equipment purchases and/or repairs, computer hardware <br />u ades and associated software. <br />Total <br /> <br />$ 30,000 <br /> <br />$ 15,000 <br /> <br />$ 331,000 <br /> <br />DWR Request <br /> <br />Controlled maintenance ofthe Satellite Monitoring System is an authorized non-reimbursable expense <br />from the Construction Fund (Section 37-60-121 (1)(b)(II), CRS), and it is included in the Board's Long Term <br />Financial Projection. Staff recognizes the value of continuing collection of real-time streamflow data and the <br />benefits to all of the CWCB's programs. Staff will be worRing hard with the DWR and other entities to more <br />thoroughly incorPorate the SateIlite Monitoring -System irito the ewcs's expanding gaging program. The <br />details of the DWR Satellite Monitoring System funding request are explained in detail in the attached memo . <br />from Hal Simpson to Rod Kuharich dated Augnst 21, 2002~ <br /> <br />Recommendation <br /> <br />Staff recommends that the Board request the General assembly authorize $231,000 from the <br />Construction Fund to be appropriated to the Colorado Wat~r Conservation Board for flood forecasting and <br />warning, instream flow monitoring, compact protection, and decision support system data collection efforts; <br />$100,000 for stream gage flood hardening projects; and $303,000 from the Construction fund to be appropriated <br />to the Department of Natural Resources for allocation to thb Division of Water Resources to enhance, renovate, <br />and replace the Data Collection Platforms in the existing satellite monitoring system. The total cost of this joint <br />gaging effort is $ 634,000. <br /> <br />. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.