Laserfiche WebLink
<br />~ ~ <br /> <br />2. Following these discussions, the CWCB staff will <br /> <br />evaluate and rank the firms based upon the information <br /> <br />provided in the PTSs, the discussions with each firm, <br /> <br />and the comments of the references provided by each <br /> <br />firm. <br /> <br />3. Contract negotiations will then be initiated with the <br /> <br />highest ranked firm pursuant to section 24-30-1404, CRS <br /> <br />1973, as amended. <br /> <br />In evaluating firms, the following factors will be taken <br /> <br />into consideration by the CWCB staff, each of which will be <br /> <br />graded from one (lowest) to ten (highest) and weighted as <br /> <br />follows: <br /> <br />151 Design of and approach to the study (as embodied in <br /> <br />the PTS and amplified in the discussion with each <br /> <br />firm). <br /> <br />151 Capability to design and estimate the costs of ~arth <br /> <br />dams and foundations, concrete dams and foundations, <br />., .,' <br /> <br />thereof, spillways, pumping plants, pipelines, and <br /> <br />canals. <br /> <br />151 Capability to design, evaluate the potential for, <br /> <br />and estimate the costs of and revenues from <br /> <br />hydroelectric facilities. <br /> <br />-10- <br />