Laserfiche WebLink
<br />- <br />D~AFT -' <br /> <br />- <br /> <br />- <br /> <br />San Luis Valley Project <br />Closed Basin Division - Waler Accounting <br />Station 281+00 Parshall Flume <br />MAY1998 Preliminary <br /> <br /> uallY I yercem volume (an -Va urne (a I oe Ivere 0 oa e lvereif To al Cle Ivered ! cumm. e vere <br /> ~Vg. DaUy 5 Day 10 Day Sodium Meeting Alamosa N.W.R. 10 Rio Grande lSee note 1\ (see note 1\ <br />DATE clsl Avo: Avn: Avn.' Isee nole 2\ TOS slds. CHOl CH02 P.P. rao ran Ian <br />01.Mav.96 54 324 307 304 54 107.1 3.3 103.6 103.6 103.6 <br />02-Mav.96 56 316 306 306 54 111.1 3.3 107.6 107.6 211.6 <br />03-Mav-96 56 322 311 309 54 115.0 3.3 111.7 111.7 323.3 <br />04-Mav-96 55 352 324 315 54 109.1 3.3 105.6 105.6 429.1 <br />05.Mav.96 55 324 326 316 54 109.1 3.3 105.6 105.8 534.9 <br />08-Mav-96 56 326 329 316 54 111.1 3.3 107.6 107.6 642.7 <br />07-Mav.98 55 351 335 322 54 109.1 3.3 105.6 105.6 748.5 <br />06-Mav.96 54 319 335 323 54 107.1 3.3 103.6 103.6 652.3 <br />09-Mav-98 58 291 323 323 54 115.0 3.3 111.7 111.7 964.0 <br />10-Mov-96 54 300 316 323 54 107.1 3.3 103.6 103.6 1067.6 <br />ll:iAa"-98 57 327 316 323 54 113.1 3.3 109.6 109.6 1177.8 <br />12-Mav-96 53 267 305 320 54. 105.1 3.3 101.6 101.6 1279.4 <br />13.Mav-96 51 286 296 317 54 101.2 3.3 97.9 97.9 1377.3 <br />14-MaV-96 <br />15-Mav-96 <br />16-Ma .96 <br />17-M. -96 <br />16.Ma -96 <br />19-Ma -96 <br />20-Ma -96 <br />21-Ma -96 <br />22-Ma -96 <br />23-Ma -96 <br />24.Mav-96 <br />25-Mav-96 <br />26.M.v.96 <br />27 -Mav-96 <br />26-Mav.96 <br />29.Mav.96 <br />30.Msv-98 <br />~V'96 <br /> '16 IJl <br />AV 55.1 316 54 <br /> 11. 96.. <br /> Total 'elivary Creditable Delivery <br /> <br />Previous Month's Year-To-Dale Total <br />Monthly Totsl <br />Year-lo-Date <br />Year~ To.date Dally Average <br /> <br />To Rio Grande <br />11734 ac-n <br />1377 a<:-It <br />13111 ac-It <br />99 ac-IUda <br /> <br /> <br />NOTES: 1. Persuant 10 ARTICLE III. 01 Iha RIO GRANDE COMPACT <br />2. Sodium sample values carried through until next analysis <br /> <br />LEGEND: CH01 =- Constant Head Turnout at Chicago Ditch <br />CH02 r:I Constanl Head Turnoul al Mum Ditch <br />P.P = Pumping Plant a' Alamosa National WlldUra Reluge <br />