Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />.' <br /> <br />Planning Study Outline <br /> <br />I. Build a Valuable Regional GIS Database For Better Comprehensiye Riyer Management. <br /> <br />11. IdentifY Areas and Causes of Riyer Instability. <br /> <br />III. Examine Other Riyer Issues. <br />A. IdentifY Areas of High Flood Hazard. <br />B. IdentifY Riparian Habitat and Recreation Concerns. <br />C. IdentifY Existing Infrastructure at Risk. <br />D. ClarifY Regulatory Requirements. <br />E. Describe and Evaluate Use oflrrigation Canal Diversions for Flood Control. <br />F. Identification of Water Quality Issues for Specific Locations. <br />G. Deyelop Alternatiyes for funding entire project. <br /> <br />IV. Conclusions and Recommendations <br />A. Develop Riyer Stabilization Altematiyes. <br />B. Design Stream Stability and Habitat Monitoring Program. <br />C. Prioritize Locations for Monitoring and Mitigation. <br /> <br />V. Deyelop Display/Education Materials. <br />A. Reyiew Historic Aerial Photographs. <br />B. Deyelop Computer Modeling to Eyaluate Tradeoffs between low impact short life <br />span strategies and higher cost alteITlatiyes. <br />C. Deyelop land use policy that promotes channel and habitat stability and restoration. <br />D. Prepare educational materials to help water users and local regulatory entities better <br />manage riyer flood plain. <br /> <br />Immediate/Emergencv Issues <br /> <br />Perform the following tasks that will be prioritized through field inspection and public meetings: <br /> <br />I. Remove major debris buildup in the river channel. <br />II. Stabilize critical riverbank erosion areas. <br />III. Remove certain sandbars. <br />IV. Protect and stabilize threatened irrigation structures and canals. <br /> <br />No changes or improvements will be made on any structure in or near the river without written <br />approval of the changes or improvements and authorization to proceed from its owner. <br /> <br />') <br />