Laserfiche WebLink
<br />, <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Colorado Water Conservation Board <br />Project Expenditure Schedule <br />Beaver Reservoir Rehabilitation <br /> <br />Sponsor: <br />Address: <br /> <br />Beaver Reservoir Company <br />14044100 Road <br />Paonia, Colorado 81428 <br />Neil Thompson, President <br />970/527-3524 <br /> <br />C-153705 <br />$ 373,000,00 <br />40 yrs, @ 3,0% <br />100% loan <br />84-0487933 <br /> <br />Contract No,: <br />Appropriation: <br />Terms: <br />Conditions: <br />Tax I.D. No.: <br /> <br />Contact: <br />Telephone: <br /> <br />Payment Date Description Amount Tot. Expend Balance <br /> $ 373,000,00 <br />1 10/16/95 Engineering/Construction $ 11,943.87 $ 11,943,87 $ 361,056,13 <br />2 10/16/95 FHA Loans $ 30,000.00 $ 41.943.87 $ 331,056.13 <br />3 12/6/95 Engineering $ 10,319,13 $ 52,263,00 $ 320,737,00 <br />4 1/24/96 Loan Payments $ 2.886.98 $ , 55.149,98 $ 317.850,02 <br />5 1/30/96 Engineering $ 622.68 $ 55,772.66 $ 317,227,34 <br />6 3/13/96 Engineering $ 795,67 $ 56.568,33 $ 316,431.67 <br />7 3/26/96 Engineering $ 4,302.77 $ 60.871.10 $ 312.128,90 <br />8 5/13/96 Engineering $ 11,795,27 $ 72.666.37 $ 300.333,63 <br />9 5/29/96 Engineering $ 2.398.40 $ 75.062.77 $ 297,937.23 <br />10 5/29/96 State Engineer's Fee $ 1.075.50 $ 76.138,27 $ 296,861,73 <br />11 7/11/96 Engineering $ 1.822,24 $ 77.960.51 $ 295,039.49 <br />12 817196 Construction $ 4.742,00 $ 82.702,51 $ 290.297.49 <br />13 9/24/96 Construction $ 66.293.10 $ 148.995,61 $ 224.004.39 <br />14 1017196 Construction $ 157.701.60 $ 306.697,21 $ 66,302.79 <br />15 10/24/96 Engineering $ 2,269,68 $ 308.966.89 $ 64.033,11 <br />16 8/21/97 Construction $ 7,545.30 $ 316,512,19 $ 56,487.81 <br />17 10/1/97 Construction $ 56,487.81 $ 373,000,00 $ - <br />