My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00024
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:45 PM
Creation date
10/4/2006 6:30:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
WSP Section - Arkansas River Basin Issues: HR 1714 - Use of Excess Capacity - East Slope Facilities - FryingPan - Arkansas Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Board Meeting March 21-22, 2002 <br />Agenda Item 21.c. <br />Page 2 of2 <br /> <br />attached). In May 2001 Rep. Hefley introduced H.R.. 1714 to enact the necessary amendments to . <br />the Fry-Ark legislation and the Board received a copy of the bill. No substantive action on H.R. <br />1714 occurred during 2001. Subsequently, several new elements of the PSOP and the related <br />legislation arose and it became necessary to amend H.R 1714. At the request of the relevant <br />Congressional Committees it was determined to re-introduce the bill, rather than amend H.R <br />1714. H.R3881 is the new bill containing the several new provisions needed to better reflect the <br />proposed modifications to the Fry-Ark Project. <br /> <br />{, <br /> <br />Discussion <br /> <br />H.R 3881 contains 3 main sections. <br />· The first is introductory, containing an overview of purposes and limitations. <br />· Section 2 authorizes the Secretary of Interior to undertake enlargement studies of Pueblo <br />Dam and Reservoir and Sugar Loaf Dam and Turquoise Lake to be funded by the SECWCD <br />and consistent with the PSOP. ' <br />· Section 3 adds several new provisioJIS' to the existing Fry-Ark authorizing legislation. <br />· Authorizes long term contracts with agencies:within the SECWCD service area to utilize <br />excess capacity in project facilities for storage and delivery of non-project water. <br />· Authorizes temporary contracts with any agency operating a water bank to utilize project <br />facilities for storage and delivery of non-proj ect water. <br />· Contains provisions related to use of revenues generated pursuant to new contracts. . <br />· Exempts such contracts from provisions of the 1982 Reclamation Reform Act. <br />· Contains limitations on expanded use of nativ:e and Colorado River water. <br />· Authorizes contracts for up to 25 years with City of Aurora to utilize excess capacity in <br />project facilities for storage and delivery of non-project water. <br />· Authorizes contracts for up to 25 years with Pueblo West Metro District to utilize excess <br />capacity in project facilities for storage and delivery of non-project water. <br /> <br />The Board can review the provisions ofH.R 3881 wJ;lich is attached and ask questions during <br />the discussion which will be led by Mr. Miskel. <br /> <br />Recommendation <br /> <br />This item is informational only, no action is recommended at this time. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.