My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00023
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:43 PM
Creation date
10/4/2006 6:30:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/16/2004
Description
Flood Section - Easement S.A. MIRO, Inc. Request for The Denver Seminary (South Platte River in Littleton, CO)
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />?- -.--- <br /> <br />---- - - - _....::... - - - - - . <br /> <br />. <br /> <br />III <br /> <br />- --.-.- <br /> <br />March 1, 2004 <br /> <br />Larry Lang <br />Chief, Flood Protection Section <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Room 721 <br />Denver, CO 80203 <br /> <br />DENVER. Ft. Collins <br /> <br />RE: <br /> <br />Colorado Water Conservation Board (CWCB) Floodplain Awareness Statement <br />Denver Seminary <br />S. A. Miro, Inc. Project No. 03092 <br /> <br />Structural Engineering <br /> <br />Dear Mr. Lang: <br /> <br />CiviJEngineering <br /> <br />As required by the CWCB Easement Application, this letter serves to notify CWCB of the <br />project's awareness of and compliance with applicable, local, state, and federal environmental <br />and floodplain regulations. <br /> <br />Analytical Consulllng <br /> <br />A.rcI;ttectural Engineering <br /> <br />The project applicant and Owner are aware that a portion of the proposed easement lies <br />within a 1 OO-year floodplain as defined by FEMA Firm Map No. 08005C0435 J: revised <br />8/16/95 and understand that this portion is subject to compliance with applicable. local. state, <br />and federal environmental and floodplain regulations. The project will limit impacts to the <br />floodplain and environment to the construction period of the proposed drainage outfall. No <br />impact to the environment or floodplain occurs post-construction. <br /> <br />. <br /> <br />Sincerely. <br />S. A. MIRO, INC. <br /> <br />Reviewed By: <br /> <br /> <br />~~ <br /> <br />"'" <br /> <br />Steve Mystkowski, P.E. <br />Associate <br /> <br />Kent D. Brogger. P.E. <br />Associate Principal <br /> <br />S2M/szm . <br /> <br />J:\Jobs031D3092\Admin\corres~tr.0005.szm.moa.doc <br /> <br />. <br /> <br />S. A. MIRO, INC. 4582 South Ulster Street Parkway Suite 1501 <br /> <br />Denver, Colorado 80237 <br /> <br />WW'W.samiro.com <br /> <br />Tel 303-741-3737 <br /> <br />FAX 303-694-3134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.