My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00001
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:32 PM
Creation date
10/4/2006 6:30:44 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/28/2003
Description
Flood Section - Floodplain Designation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Community response: The Urban Drainage and Flood Control District transmitted a letter dated July 2, <br />2003 to the CWCB requesting fonnal designation and approval of the subject study. Douglas County <br />transmitted a request letter to the CWCB as well. The District has coordinated closely with all of the <br />affected entities (listed above) and they are aware of and support the request for CWCB action. <br />Staff findings: The subject Flood Hazard Area Delineation for Cherry Creek contains the most current <br />floodplain infonnation for the subject study reach of Cherry Creek. CWCB staff has detennined that the <br />subject floodplain infonnation is in confonnance with the CWCB's rules and regulations for floodplain <br />designation and approval. <br />Staff recommendation: Staff recommends that the Board: 1) designate and approve the 100-year detailed <br />floodplain infonnation contained in said report for Cherry Creek, and 2) authorize staff to prepare a <br />floodplain resolution to be signed by the Director and transmitted to the Urban Drainage and Flood <br />Control District, Arapahoe County, Douglas County, The City of Aurora, The City of Centennial, The <br />Town of Parker, and FEMA. This action is recommended in order to meet statutory requirements. <br /> <br />STAFF RECOMMENDATION SUMMARY <br />Resolution Number 03-570: Flood Hazard Area Delineation, Cherry Creek Corridor <br />Staff recommends that the Board: I) designate and approve the 100-year detailed floodplain infonnation <br />contained in said report for Cherry Creek, and 2) authorize staff to prepare a floodplain resolution to be <br />signed by the Director and transmitted to the Urban Drainage and Flood Control District, Arapahoe <br />County, Douglas County, The City of Aurora, The City of Centennial, The Town of Parker, and FEMA. <br />This action is recommended in order to meet statutory requirements. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.