My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00257
CWCB
>
Weather Modification
>
Backfile
>
WMOD00257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:56 PM
Creation date
10/1/2006 2:17:15 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#90-2
Applicant
North American Weather Consultants
Project Name
Grand Mesa
Date
2/20/1990
Weather Modification - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />) <br /> <br />Operations <br /> <br />The project will be operated from the permittee's main <br />office in Salt Lake City, Utah. The licensed operators in <br />control of the project shall have access to all relevant <br />National Weather Service data distributed from Suitland. <br />Maryland, via geostationary satellite to the permittee's office <br />through a Zephyr Weather Service, These data shall include. at <br />a minimum. surface hourly weather observations. upper-air <br />observations. analyzed weather charts. forecast weather charts. <br />and visible and infrared weather satellite imagery. The <br />permittee's licensed operators shall be responsible for <br />determining which generators, if any. should be operated in any <br />particular storm based upon consideration of wind flows and <br />likely transport over the target area and the seeding criteria <br />identified above. <br /> <br />During suitable storm periods. the permittee shall call the <br />local operators of the generators and give them directions as <br />to when to turn on and turn off each generator and as to what <br />the rate of emission of siver iodide should be. The permittee <br />shall be responsible for insuring that personnel are available <br />to operate each generator at all times. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.