My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00245
CWCB
>
Weather Modification
>
Backfile
>
WMOD00245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:52 PM
Creation date
10/1/2006 2:17:08 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#85-2
Applicant
Western Weather Consultants
Project Name
San Juan
Date
11/15/1984
Weather Modification - Doc Type
License & Permits
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />WEATHER MODIfICATION PERMIT <br /> <br />WY 85-2 <br />Page 5 <br /> <br />b. A summary of form WM3 indicating on which days and from which <br />generators seeding occurred in the project area and the <br />intended results bi-weekly: ' <br /> <br />1) to the Department of Natural Resources, <br />2) to newspapers in the project area (including the <br />Silverton Standard and the Alamosa Courier). <br />3) to the Colorado State Patrol and the Colorado <br />Avalanche Information Center. <br /> <br />c. A copy of the daily Worksheet Decision Summary Notification <br />form on which seed/no seed decisions are based and the form <br />indicating the parameter data information requested and <br />utilized in making avalanche suspension decisions: <br /> <br />to the Department of Natural Resources. <br /> <br />d. C.R.S. S 36-20-117(3) specifies a written final operational <br />report and a written final report, evaluating the project, or <br />an annual operational report and an annual project evaluation, <br />as the case may be. A final operational report along with a <br />preliminary scientific evaluation of the project shall be <br />filed no later than thirty days after the completion of the <br />project. A final complete scientific evaluation of the <br />project shall be filed no later than one hundred eighty days <br />after the completion of the project. An annual summary report <br />shall be filed sixty days prior to the renewal of a permit <br />under the provisions of C.R,S. S 36-20-114(2). All such <br />reports are publiC records subject to the prOVisions and <br />limitations of part 2 of article 72 of title 24. C.R.S.: <br /> <br />to the Executive Director of the Department of Natural <br />Resources <br /> <br />11. To comply with the minimum guidelines for coordination of this <br />project with other State weather modification projects the Applicant <br />shall: <br /> <br />a. notify the designated representative of the Department of <br />Natural Resources each day seeding occurs of the location, <br />time, and rate of proposed seeding. <br /> <br />b. notify any other operator authorized to modify the weather in <br />the State during the designated time period before and after <br />cloud seeding operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.