Laserfiche WebLink
<br />,.. . <br />. -" -. ;,. j <br /> <br />Attachment B <br /> <br />Page 2 <br /> <br />i <br />< <br /> <br />Each weather system will be evaluated as a potential augmenta- <br />tion unit and seeding operations will be conducted in those <br />portions of the cloud regime which are determined too be favorable <br />fur precipitation augmcntntion~ <br /> <br />The requested generators in the network will be ignited one to <br />three hours prior to the onset of seedable clouds and shut down <br />approximately one to three hours prior to the end of the potentially <br />favorable period for seeding. These times should allow.for ample <br />transport nnd diffusion of seeding material during the initial <br />precipitation period and t:l.me for the utilization of the seeding <br />material before conditions end or become unfavorable in the <br />seeded area. <br /> <br />In cases where low-level inversions and blocking flow are present, <br />the generator network will be altered from normal patterns to <br />take into consideration where the pooling and ventilation zones <br />will uccur. <br /> <br />'. <br /> <br />./ <br /> <br />/ <br /> <br />. <br /> <br />() <br /> <br />..t! ____-.....,;;; <br />