My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00225
CWCB
>
Weather Modification
>
Backfile
>
WMOD00225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:46 PM
Creation date
10/1/2006 2:16:57 PM
Metadata
Fields
Template:
Weather Modification
Applicant
J. William Bullock
Project Name
E. of Colorado Springs Research Project
Date
3/15/1978
Weather Modification - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />..'~ <br />..;- <br /> <br />FORM WM2/' . <br /><., <br /> <br />. <br /> <br />~, <br /> <br />'- <br /> <br />APPLICATION FOR PERMIT FOR, <br />WEATHER MODIFICATION ACTIVITIES <br /> <br />(under'Colorado Weather Modification Act of 1972). <br /> <br />(Use additional sheets if necessary; maintain reference to the application paragraphs.) <br /> <br />1. Applicant: <br />2. Domicile or applicant: 1100 Kachina, Colorado Springs, Colorado, 80915 <br /> <br />J. William Bullock <br /> <br />3. Principal Colorado address of applicant: <br /> <br />(same) <br /> <br />4. Business address of applicant: AIRO~.Irlc.. P.O. Box 731, Colorado Springs, Co. 80901 <br /> <br />5. Licensed person in control: <br />The person or, persons holding a valid weather modification license (under 151-1-10, <br />eRS 1963, as amended) who will be in field control of ,the project or activities for <br />which a permit is requested are:J.William Bullock <br /> <br />6. Time period during which the proposed operation shall continue: from issuance of <br />'Dermit until 15 A1)ril 1978 <br /> <br />7. Name and address of applicant or other person on whose behalf the operation is to <br />be conducted. Dr. Bernard Vonnegut, De1)t. Atmos1)heric Science, State University of <br />New York at Albanv, Albany. New York 12222 <br /> <br />8. Operational Plan: <br />Attached to this application is an operational plan, prepared by the licensee(s) <br />above, which contains each of the following elements: <br /> <br />a. A statement of the nature and objectives of the proposed project. <br /> <br />b. A map of the proposed operating area specifying the primary target area and <br />the area reasonably expected to be affected. (Map should be reproducible.) <br /> <br />c. <br /> <br />Description of how the project will be implemented and carried out. <br />location,weather data available, types of aircraft, seeding devices <br />material, seeding rates, etc.) , , <br /> <br />(office <br />and <br /> <br />d. Any expected effects upon the environment resulting from the proposed: project <br />and the methods of determining and evaluating those effects. <br /> <br />e. Any additional information which may be required to describe the operation <br />and the proposed method of its evaluation. <br /> <br />9. Factors indicating that the proposed weather modification project is conceived to <br />provide and offers promise of providing an economic benefit to the area in which <br />the operation will be conducted (applicable only to commercial projects): <br />(this, is' a scient; f; c 're.earch 'Project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.