Laserfiche WebLink
<br />. <br /> <br />14. Controlling Weather Modific:ation Operations (cont) <br />: <br />i <br />, <br />Following each seeding ioperation, each generator operator that <br /> <br />was instructed to run his quclei generator will submit a written <br />I <br />report on the actual operations times, verify the seeding rates and <br />, <br />note any weather observati9ns or operational discrepancies during <br />i <br />his requested operating peDiod. A summary of these reports for each <br /> <br />seeding operation will be ~rovided to the Department of Natural <br /> <br />Resources on a regular bas~s as required. <br />: <br />The generator network will be serviced primarily by trained <br /> <br />and experienced personnel ~ith from three to seven years of recent <br />, <br />field experience on weathe~ modification programs. Additional help <br /> <br />as needed will assist thesJ technicians in maintaining the availabil- <br />: <br />ity ,and proper operation o~ the generators in the network. Because <br />, <br />of ,their familiarity with rlhe types of weather conditions considered <br />I <br />for seeding, the techniciarls' weather observations from the various <br />. i <br />portions of the seeding arJas provide additional information to the <br />I <br />meteorological personnel fdr continuous operational program control. <br />I <br /> <br />-11- <br />