Laserfiche WebLink
<br />ATTAC~lENT B CONTINUED <br /> <br />Each weather system will be evaluated as a potential <br />augmentation unit and seeding operations will be conducted <br />in those ~oLtions of the cloud regime which are deter~ined <br />to be favorable for precipitation augmentation. <br /> <br />The requested generators in the network will be ignited one <br />to three hours prior to the onset or seedable clouds and <br />shut down approximately one to three hours prior to the end <br />of the potentially favorable period for seeding. These <br />times should allow for ample transport' and diffusion of <br />seeding material during the initial precipitation period <br />and time for the utilization of the seeding material before <br />conditions end or become unfavorable in the seeded area. <br /> <br />In cases where low-level inversions and blocking flow are <br />present, the generator network will be altered rrom normal <br />patterns to take into consideration where the pooling and <br />ventilation zones will occur. <br /> <br />. <br />