My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00155
CWCB
>
Weather Modification
>
Backfile
>
WMOD00155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:28:14 PM
Creation date
10/1/2006 2:14:38 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#94-6
Applicant
North American Weather
Project Name
Willow Creek Basin
Date
11/1/1993
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />6.0 SUMMARY AND RECOMMENDATIONS <br /> <br />A second winter season of cloud seeding operations was conducted over the <br />Willow Creek Drainage located in north centra] Colorado. The program was operated <br />during a two month period between February 1, 1994 and March 31. As in the fIrst <br />season, seeding was accomplished using 15 ground based silver iodide generators. There <br />were eight seeding episodes during the operational period in which the generators were <br />operated a total of 574.5 hours. <br /> <br />An evaluation of the second season of operations, based on a target-control <br />comparison of April I snowpack (water content), indicates that a possible increase of <br />approximately 25 percent occurred. This percentage is higher than anticipated and may <br />be partly due to the unusual 1993-94 winter season experienced in u""to_ r\_' Ido. <br />:sult <br /> <br />Taken toget"~- - '.' c5Yl.\W'\ ./ <br />indicated a I ~ \:-to eN .7 ..:.--- <br /> (e-b 300 J L'ta'-f. Cl <br /> , <br /> The ( <br />flow was les f1w 21'10 ~1'1 L 0 <br />, <br />southern mos - <br /> t~q(: 0 <br />be in a good J S1'-f.~ <br />weather situat r <br /> <br />r1y <br />:he <br /> <br />to <br />:al <br /> <br />NA we . _.w' .If <br />1994-1995. Ti _ ---'0 .0 u",ug conducted in the interest of developing more effIcient <br />seeding material output. If progress is made in this endeavor, results will be released <br />to the NCWCD for their possible use in future projects. <br /> <br />It is recommended that this program be continued. An earlier start date (perhaps <br /> <br />in November) would insure that no good seeding opportunities are missed during a water <br /> <br />year that turns out to be below normal. <br /> <br />6.] <br />
The URL can be used to link to this page
Your browser does not support the video tag.