Laserfiche WebLink
<br /> <br />/,/"'~ <br />~ <br />"' <br />"" <br /> <br /> <br />WESTERN <br />WEATHER <br />CONSULTANTS, INC. <br /> <br /> <br />P.O. BOX 58 <br /> <br />* <br /> <br />DURANGO. COLORADO 81301 <br /> <br />* <br /> <br />PHONE (303) 247-8813 <br /> <br />February 3, 1994 <br /> <br />Mr. Jon Reveal ,Vice President of Operations <br />Aspen Sk.iingCompany <br />P. O. Box 1248 <br />- -- - - - - - - - -Aspgn,GO--3-1-6+2- -- - - - -- - -- - - -- - -- - -- - -- - - - - -- - - - - - - -- - -- - - - - - - - - - - - -. - - - - <br /> <br />Dear Jon: <br /> <br />Listed below is a summary of the seeding operat ions that were conducted over the Aspen sl: i areas <br />from January I , 1994 through January 31, 1994: <br /> <br />J6Il. J, J994 SIlt. PM to Sun. AM 4 Generators 40.50 hours <br />Jan. 4,1994 Tue. PM to Woo. PM 3 Generators 50.00 hours <br />Jan. 9,1994 Sun. PM to Mon. AM 6 Generators 99.50 hours <br />Jan. 13, 1994 Thu. AM to Thu. PM 2 Generators 24.50 hours <br />Jan. 16, 1994 Sun. AM to Sun. PM 6 Generators 49.50 hours <br />Jan. 25, 1994 Tue. PM to Thu. AM 6 Generators 154.75 hours <br />Jan. 29,1994 SIlt. AM to Sun. AM 6 Generators 100.00 hours <br /> <br />TOTAL SEEDING HOURS DURING THESE 7 SEEDING EVENTS = 518.75 HOURS <br /> <br />The total cumuJative hours of seeding for three months of the Prf1Jram this winter are 1 ,157.50 <br />seeding hours over nineteen events. This wi111eave 142.50 of the schoouloo seeding hours from <br />the first three months of the contract available for February's extended operations. <br /> <br />S:L' <br />O(~ .' <br />Larry Hjermstad, <br />President <br /> <br /> <br />WEATHER MODIFICATION . RESEARCH <br />CONSULTING METEOROLOGISTS TO BUSINESS <br /> <br />. <br /> <br />FORECASTING . <br />AGRICULTURE <br /> <br />CLIMATOLOGY <br />GOVERNMENT <br /> <br />INOUSTRY <br />