My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00114
CWCB
>
Weather Modification
>
Backfile
>
WMOD00114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:27:57 PM
Creation date
10/1/2006 2:13:29 PM
Metadata
Fields
Template:
Weather Modification
Applicant
Western Kansas Groundwater Management Dist. #1
Project Name
Muddy Road VI
Date
5/1/1980
Weather Modification - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Target Area Rawinsonde - KWRB Upper Air Station <br />Extra-Area Storm Surveillance - NWS Radar, <br />Telefacsimile repeater <br />Operating Area Storm Data - Project Radar <br /> <br />5.4 Seedability Forecasts - Daily Operating Decisions <br /> <br />Each day seedability forecasts will be prepared by <br />the project Director, using the information available from the <br />sources shown in paragraph 5.3. The criteria described in <br />paragraphs 5.1 and 5.2 will serve as a guide in making the seed, <br />no-seed decision. <br /> <br />Normally by 10:30 aomo (MDT) sufficient weather data <br />is available to give a good indication of the cloud conditions <br />that will affect the project area for the ensuing 24 hours. At <br />this time the seeding plans for the day will be issued to air <br />crews and maintenance personnel. If seedable conditions are <br />expected, the crews will be given details about standby status, <br />seeding strategy, seeding rates and expected duration of the <br />cloud system. If no seedable clouds are expected, the crews <br />will be placed on appropriate standby status for recall in the <br />event unpredicted storms threaten the project area. Figure 2 <br />is a flow-chart of events which take place on a typical day. <br /> <br />The initial daily operation decisions are made on <br />the basis of forecast information and cloud model calculations 0 <br />While the data inputs are very useful in working out crew <br />schedules and seeding strategy, they are not the only factors <br />for making final seeding decisionso For working out the final <br />seeding strategy, the Project Director, licensee, will also <br />use real-time observations obtained from the project radar and <br />pilot reports. <br /> <br />5.5 Coordination With Other Projects <br /> <br />Plans published by the Water and Power Resources Ser- <br />vice indicate a closing of HIPLEX research in Northwest Kansaso <br />Every effort will be made to cooperate with them in their re- <br />search activities if resumed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.