Laserfiche WebLink
<br />A. is conceived to provide, and offers promise of providing, an economic benefit <br />. to the area in which the operation will be conducted [ ~.36-~0-112 (3)(a), . <br />CRS], '.. <br /> <br />B. is reasonably expected to benefit the people in the area in which the operation <br />will be conducted [ ~ 36-20-112 (3)(b), CRS], <br /> <br />C. is scientifically and technically feasible [ ~ 36-20-112 (3)(c), CRS], <br /> <br />D. does not involve a high degree of risk of substantial harm to land, people, <br />h~th, safety, property, water rights, or the envirO!1ffii.mt.[ ~ 39~20-I-l2 (3)(e),. <br />CRS},' . <br /> <br />E. includes adequate safeguards to prevent substantial damages to land, property, <br />- - - - - - -. - - - - - - - - - - - - - - - - -watef right-s, peeple,-health; ~afety;-orihe environment1-i-36c:lOo 1-12-(3)(f),- <br />CRS], <br /> <br />F. will not adversely affect another weather modification project [ ~ 36-20-112 <br />(3)(g), CRS], and <br /> <br />G. is designed to minimize risk and maximize scientific gains or economic <br />benefits to the residents of the area [ ~ 36-20-112 (3)(h), CRS]. <br /> <br />DECISION <br /> <br />Because the proposed project meets all of the requirements of ~ 36-20-112, CRS, it is hereby <br />determined that the permit is.approved with the following conditions. <br /> <br />1. The applicant will prepare a written report montWy and at end of th'e project in <br />accordance with the requirements of the permit. <br /> <br />2. The applicant will cooperate with the State in conducting research on hail cannons <br />through Colorado State University or other educational institution as arranged by the <br />Department of Natural Resources. <br /> <br />3. The check for payment of review fees must clear the bank and the applicant must <br />agree to pay the commercial fee. <br /> <br />4. The applicant agrees to furnish the results of sound tests conducted by Dr. Dennis <br />Fleisher, or other sound expert, by July 30, 1996. <br /> <br />5. The applicant will install sound barriers around the hail cannons in accordance with <br />the conditions in the permit. <br /> <br />6 <br />