Laserfiche WebLink
<br />"\ <br /> <br />9. Controlling Weather Modification,Operations (continued) <br /> <br />Following each ..eeding operation, each generator ',perator that <br /> <br />was instructed to run his nuclei generator will submit a written <br /> <br />r..port on the actual operations times, verify the seHding rstes and <br /> <br /> <br />note any weather observationa 01: operational diacrep,ancies during <br /> <br />his requested operating period. A summary of these reports for each <br /> <br />seeding operation w11l be provic1ed to the Departmen': of Natural <br /> <br /> <br />Resources on a regular basis as required. <br /> <br /> <br />The generator network'".'ltUl be serviced primariJ.y by trained <br /> <br /> <br />and experienced personnel ~ith ~p to 25 years of recent field <br /> <br />experience on weather modification programs. Additional help <br /> <br /> <br />ss needed will assist these technicians in maintsLning the availability <br />" <br /> <br />snd proper operation of the gen<lrators in the net'.,.,rk. Because <br /> <br />of their familiarity with the types of weather cenditions considered <br /> <br /> <br />for seeding, the technicians' weather observations frolll the various <br /> <br /> <br />~ portions of the seeding sreas provide additional information to the <br /> <br /> <br />meteorological personnel for continuou.. operational progrlllll controL <br /> <br />IO~ Describe how other weather modificstion projec~s (if any) could be <br />affected adversely by the proposed project: <br /> <br />There will be a coordinalion of lite seeding operations in lhe SIlO Juan Program and the Telluride and <br />Upper Sail Miguell'rogrwn III oplimize the seeding afTecls in hoth Program areas. <br /> <br />, <br /> <br />~" <br />