My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00075
CWCB
>
Weather Modification
>
Backfile
>
WMOD00075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:27:44 PM
Creation date
10/1/2006 2:12:35 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
#2000-2
Applicant
Western Weather Consultants
Project Name
San Juan
Date
11/1/2000
Weather Modification - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9. Controlling Weather Modification Operations (continued) <br /> <br />Following each seeding operBtion, each generator operator that <br /> <br />was instructed to run his nuclei generator will submit a written <br /> <br />report on the actual operations times, verify the seeding ratea and <br /> <br /> <br />note any weather observations or operational discrepancies during <br /> <br />his requested operating period. A liUounary of these reports for each <br /> <br />seeding operation will be provided to the Department of Natural <br /> <br /> <br />Resources on a regular basia as required. <br /> <br /> <br />The generator network will be serviced primarily by trained <br /> <br /> <br />and experienced personnel with up to 25 yeara of recent field <br /> <br />experience on weather modification programs. Additional help <br /> <br /> <br />as needed will assiat theae technicians in maintaining the availability <br /> <br />and proper operation of the generators in the network. Because <br /> <br />of their familiarity with the types of weather conditions considered <br /> <br /> <br />for seeding, the technicians' weather observations from the various <br /> <br /> <br />portions of the seeding areas provide additional information to the <br /> <br /> <br />meteorological personnel for continuous operational program control. <br /> <br />10. Describe how other westher modification projects (if any) could be <br />affected adversely by the proposed project: <br /> <br />There will be a coordination of tbe seeding operations in the San Juan Program and the Telluride and <br />Upper San Miguel Program tjJ optimize the seeding a/reets in hoth Program areas, <br />
The URL can be used to link to this page
Your browser does not support the video tag.