Laserfiche WebLink
<br />WEATHER MODIFICATION OPERATIONS REPORT <br /> <br />Western Weather Consultants, Inc. YaiVBeaver Creek Date: February I, 1998 <br />Durango, Colorado Period Covered: Jan. 1-31, 1998 <br /> EVENT #11 <br />Site N..... Date IIegiD Time End Time TotHn Rate Tot Output % Vail 0/0 Beaver C. <br />10 Wermuth 118198 11819812:15 PM 118198 9:00 PM 8:45 5 43.75 50.00%, 50.00"/0 <br />BC Beaver Creek 118198 1181981:00 PM 118198 9:30 PM 8:30 5 42.50 100.00"/0 0.0001'0 <br />K BeIlefeville 118198 118198 11:00 AM 1/8/98 9:00 PM 10;00 5 50.00 0.00% 100.00% <br /> 27:15 136.25 <br /> EVENT #12 <br />Site Name Date Begin Time End Time TotHn Rate Tot Output 0/. Vail 0/0 Beaver C. <br />H vanCampen 1/11198 1/11198 10:00 PM 1/12198 10:00 AM 12:00 7.5 90.00 HX1OO% 0.00% <br />10 Wennuth 1110198 lII0198 10:30 AM IIIl/98 1:00PM 26:30 10 265.00 100.00"/0 0.00% <br />10 Wennuth 1/11/98 1/111981:00 PM 1/12198 !0:00AM 21:00 7.5 157.50 100.00"1. 0.00% <br />II Brent 1/10/98 1/10198 10:00 AM 1110198 10:00 PM 12:00 10 120.00 0.00% 100.00% <br />11 Brent 1111/98 1/111984:30 PM 1112198 9:00 AM 16:30 7.5 123.75 0.00% 100.00% <br />BC Beaver Creek 1110/98 1/101989:45 AM 1/12198 10:30 AM 48:45 10 487.50 100.00% 0.000/0 <br />K BellefevilIe 1110/98 lII0198 10:00 AM 1110/98 5:00 PM 7:00 10 70.00 0.00% 100.000/0 <br />K BeUefeville 1/11/98 11II198 9:30 AM 1/1219812:00 PM 26:45 7.5 198.75 0.00% 100.000/0 <br /> 168:30 1512.50 <br /> <br />2 <br />