My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPP00139
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPP00139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:47:40 AM
Creation date
10/1/2006 2:08:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.300.40.A
Description
Colorado River Basin-Colorado River Basin Legislation/Law-Compacts-Colorado River Compact
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/1/1981
Title
Colorado River Compact-Synopsis of Major Documents-Colorado Water-Key to Tomorrows Quality of Life
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J <br /> <br />DOMI~.qUEZ <br /> <br />Location: <br /> <br />Wesl-cenlral Colorado in Delta and Mesa Counties. <br />between the cities 01 Grand Junction and Delta. <br /> <br />Sponsors: <br />Mesa County Dominguez Reservoir Advisory Council, <br />Grand Junction and Delta Chambers 01 Commerce. <br /> <br />Primary Purpose of the Project <br />Peaking and Conventional Hydroelectric Power. <br />Secondary Benefits: <br />Municipal and Industrial waler development: Recreation: <br />Fish and Wildlife enhancement; Cultural Resource Protec- <br />tion and Water Quality ImprOllement. <br /> <br />History and Background: <br /> <br />Regulation and storage of Gunnison River lIows in the <br />canyon south of the city 01 Grand Junction have been <br />considered for many years. A report prepared in 1946 <br />included a proposed Whilewater Reservoir as part of the <br />Cisco.Thompson Project. The damsite for this early plan <br />was on the Gunnison River about 6 miles above its <br />confluence with the Colorado River This reservoir would <br />have had a capacity of about 1.5 million acre-feet and <br />would have supplied irrigation water to more than 90,000 <br />acres and produced 18 megawalls of power It would, <br />however, have inundated the town of Whitewater and the <br />stretch of Colorado Highway 141 which now passes <br />through Unaweep Canyon. <br /> <br />In December 1950, a report recommendedtheWhitewater <br />Unit as one of five major project units, and would have <br />included an aao,DOO-acre.foot impoundment known as <br />Bridgeport Dam and Reservoir, about 2 miles south of the <br />town of Whitewater. The project would have provided <br />long.term storage, irrigation flows, and 48 MG of power <br />produced by three generators The normal water surface <br />elevation would have required construction of three dikes <br />along the east side of the reservoir to prevent flooding 01 <br />the area where Highway 50 now exists. In the final <br />Commissioner's report dated December 1950. the nameol <br />the site was changed to Whitewater Dam and Reservoir. <br />This site was later to become the Dominguez Damsite, <br />although it was changed slightly in 1978toavold a surface <br />slide area on the lelt abutment (moved 700 feet farther <br />downstream). <br /> <br />The Gunnison River ProJecl Reconnaissance Report 01 <br />1951 included plans almost identical to Whitewater Dam. <br />except that this proposal would have provided water for <br />irrigation in the Whitewaler and Kanna Creek areas, as <br />well as power and storage <br /> <br />In the early 1970.s, a smaller reservoir known as <br />Dom inguez lake was proposed as part of the Uncom- <br />pahgre Project ImprOvement and Extension Project. Con- <br />gress later divided the prOJect into the Uncompahgre <br />Improvement Project and the Dominguez Reservoir Pro- <br />ject (the extension portiOn). <br /> <br />The present investigation of the Dominguez Reservoir <br />PrOject was authorized by the Water Resource <br />Developments. Feasibility Studies Act of OctOber 27, <br />1972, (Public law 92-Sn). <br /> <br />Feasibility investigations were initiated in January 1975 <br />with the formation of the multiobjective planning (MOP) <br />team. The team has studied a multItude of alternatives in <br />the planning process. These alternatives will be presented <br />in the feasibility report and the environmental impact <br />statement. The alternatives to be covered include No <br />Development. the Non-Structural Plan, the Environmental <br />Quality EmphaSis Plan, the Environmental Development <br />Emphasis Plan, several other structural plans, and the <br />recommended plan The Feasibility Report is scheduled <br />for mid-calendar year 1981 The Draft Environmental <br />Impact Statement and public meeting are due lale calen- <br />dar year 1981. and the Final Environmental Impact <br />Statement in mid-calendar year 1982. <br /> <br />The recommended plan considers both economic <br />development and environmental values_ Two dams. two <br />reservoirs, and two powerplants would be constructed tor <br />power generation. Dominguez Reservoir, the larger of the <br />two. would provide water for municipal and industrial use, <br />with some recreational development of both the reservoir <br />and the river below. The plan would provide lor preserva- <br />tion and enhancement of fish and wildlife potential above <br />and below Ihe reservoir and for preservation of cultural <br />resources and scenic values of the area. <br /> <br />(Continued on next page} <br /> <br />II <br />I <br /> <br /> <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.