My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPP00139
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPP00139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:47:40 AM
Creation date
10/1/2006 2:08:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.300.40.A
Description
Colorado River Basin-Colorado River Basin Legislation/Law-Compacts-Colorado River Compact
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/1/1981
Title
Colorado River Compact-Synopsis of Major Documents-Colorado Water-Key to Tomorrows Quality of Life
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />WEST DIVIDE (Cont,nu.') .. i ~. <br />6... w <br />rescaped the project and different water sources were ater surface area (acres) <br />identified. Total pool <br />Inactive pool <br />Shoreline (miles) <br /> <br />The Draft Definite Plan RepOr1 is scheduled lor mid. <br />calendar year 1980. The Ora" Environmental Impact <br />Statement and public hearings are due in late calendar <br />year 1980 and the Final Environmental Impact Statement <br />In early calendar year 1981. <br />Water lor the project would be obtained mainly by <br />pumping horn the COlorado River near the town of Sill. <br />This waler plus water from East and West Divide Creeks <br />would be distributed throughout the service area by a <br />system of four prOject canals and the necessary lateral <br />systems. Two reservoirs would be constructed. one on <br />West Divide Creek lKendig Reservoir) above the project <br />service area and the second (Dry Hollow Reservoir) within <br />the irrigation service area. Additional municipal water <br />would be made available from Beaver and Battlement <br />Creeks by ell.changing presenl irrigation supplies in those <br />streams with water 'rom Cache Creek Canal. Diversion <br />and distribution of this water would be the responsibility of <br />the water users. Recreational developments would be <br />provided at both project reservoirs. Late-season pumping <br />from the Colorado River would be supplied by releases <br />from Green Mountain Reservoir, an ell.lsting leature of the <br />Colorado-8ig Thompson Project. <br /> <br />Physical Facts and Figures: <br /> <br />Dams- <br />Height above streambed (f1) <br />Cresllength (f1) <br />Type <br /> <br />0.., <br />Hollow <br />171 <br />2,195 <br />earthtitl <br /> <br />Kendig <br />202 <br />1,530 <br />earthlill <br /> <br />Reservoirs - <br />Capacity (A.F.) <br />Active <br />Dead and inactive <br />TOlal <br />Surcharge <br /> <br />16,840 <br />1,220 <br />18.060 <br />3.290 <br /> <br />19,100 <br />4.300 <br />23,400 <br />1,800 <br /> <br /> <br />Diversion dams - <br />Spillway crest length (11) <br />Diversion capacity (cis) <br /> <br />Pumping Plants - <br /> <br />Divide Creek <br />Dry Hollow <br />Unit No.1 <br />Unit No.2 <br />West Divide <br /> <br />Canals - <br /> <br />Dry Hollow Feeder Canal <br />Cache Creek Canal <br />Hunter Mesa Canal <br />West Divide Canal <br /> <br />Water Supply - <br /> <br />Project irrigation <br />Surface Irrigation <br />Full service <br />Supplemental service <br />Subtolal <br />Sprinkler Irrigation <br />Full service <br />Supplemental service <br />Subtotal <br />Total- <br />Project Irrigation <br /> <br />Municipal - <br />Rural area south of Rifle <br />Town ot Parachute <br />Banlement Mesa planned <br />unit development <br />Rural area south of Slit <br />Total <br /> <br />270 493 <br />54 157 <br />49 5.6 <br />E. Divide W.Dlvlde <br />50 60 <br />60 7S <br />Max.lIt1 Capacity <br />(feet) (cta) <br />612 130 <br />80 105 <br />314 115 <br />420 10 <br />Length CapacIty <br />(mllea) (efs) <br />11 130 <br />28 225 <br />9 115 <br />13 95 <br />Avg.Annual Service <br />water supply Area <br />(A.F,) (acr..) <br />14.000 3.610 <br />23,400 10.580 <br />37.400 14.190 <br />17,300 6,840 <br />6000 4,~ <br />~ 10, <br />60.700 25.170 <br />1,300 <br />400 <br />1,200 <br />600 <br />3,500 <br /> <br />Population to be served: Municipal and rural domestic <br />waler would be supplied to about 22.000 peoole and about <br />195 larms would be supplied irrigation water. <br />Estimated Cosls: TOlal Construction - $195,600.000. <br />Annual operation, maintenance, and replacement costs <br />11917.79 priceS) $470.000. <br />Construction Schedule: An S.year program would be <br />needed fOr construction 01 all project features except the <br />drains. which would be constructed as needed after <br />irrigation water had been applied to the land and drainage <br />deficienCles noted. <br /> <br />Proposed Sources of FundIng: <br />Federal. Basin Fund and Colorado RlverStorage Project. <br /> <br />For Further Informetlon Contact <br /> <br />J. F. Rinckel; Projects Manager <br />Water and Power Aesources Service <br />764 Horizon Drive. Grand Junction. CO 81501 <br />243-4992 <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.