Laserfiche WebLink
<br /> - ._" <br /> t):j <br /> . INDIAN CLAI.SUMMARY UPDATE JANUAR.89 <br /> , TOTAL <br /> POTENTIAL PRESENTLY NEGOTIATED I~lAN SETTLE- <br /> INDIAN IRRIGATED IRRIGATED IRRIGABLE AMOUNTS U.S.B.R. MENT <br /> STREAM CLAIMS INDIAN NON-IND. IND. LAND A.F ./YR PRIORITY PROJ. LAND LANDS NOTES <br /> San Juan R. <br /> (southwest) 22,707 640 1,600 AF 1868 7,500 8,140 11 <br /> McE1mo Cr. 1,286 34 42,600 2/ <br /> Mancos R. 42,814 335 11,700 8,400 25,800 AF 1868 11,600 20,000 1./ <br /> (1985)* <br /> La Plata R. 16,762 12,413 1,800 1,800 2/ <br /> Animas R. 2,375 14,200 <br /> Florida R. 1,800 835 21,500 545 1,090 AF 1868 1,102 1,647 !Y <br /> (1976)** <br /> San Juan R. <br /> (central) 2,201 2,100 <br /><=> Los Pinos R. 13,130 43,200 1/ <br />W <br />os:. Piedra R. 1,446 433 7,800 600 1,850 AF 1868 600 <br />(j) 535 1,595 AF 1868 535 <br /> 61 183 AF 1868 61 2/ <br /> San Juan R. (1976)** <br /> (East) 1,499 126 13,700 1,317 3,876 AF 1868 1,317 1/ <br /> Navajo R. 161 4,500 <br /> Dolores R. 2,200 !if <br /> TOTAL IN ACRES 93,051 14,893 175,913 34,100 <br /> <br />11 <br />2/ <br />2/ <br />4/ <br />51 <br /> <br />2/ <br /> <br />Dolores proj: The Ute Mt. Tribe will receive 23,300 AF for irr., 1,000 AF for M&I, and 800 AF for recreation <br />Present non-Indian lands irrigated from the Dolores River <br />Animas-La Plata Proj: The Ute Mt. Tribe will receive 26,300 AF for irr. of 11,600 acres and 6,000 AF for M&I; the <br />So. Ute Tribe will receive 3,400 AF for irr. o~ 1,800 acres and 26,500 AF for M&I <br />Florida Proj: The Indians will receive 2,553 AF for irr. of 1,102 acres including 835 acres presently irrigated <br />The So. Ute Tribe received 213 cfs with an 1868 priority in 1930 to irrigate 16,966 acres including 31.3 cfs for <br />allotments <br />The So. Ute Tribe will receive a storage right on Sto11steimer Cr. for 1,850 AF with an 1868 priorityl and 1,850 AF <br />refill with a 1986 priority to irrigate 600 acres, a direct flow right on the Piedra River to irrigate 535 acres with <br />an 1868 priority, and a direct flow right to irrigate 61 acres on Devil Cr. with a 1976 priority <br />The So. Ute Tribe will receive 1,530 AF from the San Juan R.; 975 AF from Round Meadow Cr., and 1,371 AF from Cat Cr. <br />The Dolores River is the source of supply for the Dolores Project <br />Subordinated 1868 to all rights adjudicated prior to January 1, 1985 <br />Subordinated 1868 to all rights adjudicated prior to January 1, 1976 <br />(The Tribes received a reserved project right for the Animas-La Plata and Dolores Projects with the date of priority <br />to be the same as the Projects', and are to share on a pro-rata basis with the Projects' users.) <br /> <br />7/ <br />8/ <br />-* <br />** <br />