My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPP00058
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPP00058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:26:08 PM
Creation date
10/1/2006 2:01:44 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064
Description
Indian Water Rights
State
CO
Date
1/1/3000
Title
Colorado Ute Indian Water Rights-Final Settlement Agreement-December 10 1986-Platte River Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. SOUTH CANAL <br /> <br />. <br /> <br />,. <br /> <br />The South Canal branches off from the Dove Creek Canal near PleaRant View, <br />Colorado and extends for 6.9 miles to the south and west. It has an initial <br />capacity of 150 cubic feet per second and a terminal capacity of 106 cubic <br />feet per second and includes turnouts to two pumping plants and three lateral <br />systems. <br /> <br />DOLORES TUNNEL <br /> <br />The Dolores Tunnel carries water through the DoloreR-San Juan Divide about 2 <br />miles west of the town of Dolores, It replaces the old MVIC Tunnel which has <br />been abandoned and plugged. The maximum capacity of the new tunnel is 520 <br />cubic feet per second. <br /> <br />DOLORES CANAL <br /> <br />The Dolores Canal begins at the outlet of the Dolores Tunnel and extends 0.6 <br />miles to the south and east, supplying irrigation water to an existing canal <br />system and M&I water to the City of Cortez and Montezuma Water Company. The <br />canal will also carry water to the Towaoc Canal Powerplant. The initial <br />capacity is 520 cubic feet per second, and the terminal capacity is 475 cubic <br />feet per second. <br /> <br />TOWAOC CANAL POWERPLANT <br /> <br />The Towaoc Canal Powerplant will have a capacity of 12.2 megawatts and will <br />produce an average of 30,318,000 kilowatt-hours annually, A 7R-inch diameter <br />buried pipe penstock will head at a structure on the Dolores Canal and extend <br />2.2 miles to the southwest to the powerplant. The powerplant will discharge <br />its water into the beginning of the Towaoc Canal. <br /> <br />TOWAOC CANAL <br /> <br />The Towaoc Canal will begin at the Towaoc Canal Powerplant and extend <br />southward for 45.4 miles to the full-service lands in the Towaoc area. For <br />the first two-thirds of its length the canal will approximately follow the <br />routes of two existing MVIC canals, the Lower Hermana Lateral and the <br />Highline Ditch, which the Towaoc Canal will replace. The canal will be <br />earth-lined for 32.8 miles and .concrete lined for 7.5 miles. It will have an <br />initial capacity of 435 cubic feet per second and a terminal capacity of 86 <br />cubic feet per second, The canal will have dozens of turnouts to Montezuma <br />Valley farmlands, eight turnouts to the Rocky Ford Laterals, and five <br />turnouts to the Towaoc Laterals. <br /> <br />TOWAOC M&I PIPELINE <br /> <br />The Towaoc M&I Pipeline will begin at the City of Cortez and extend southward <br />10 miles to near Towaoc. This pipeline will carry 2.9 cubic feet per second <br />of municipal and industrial water to the Ute Mountain Ute Indian Reservation. <br /> <br />0306 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.