Laserfiche WebLink
<br />Laterals............................... . <br />tnal rehabilitation by district. . . . . . . . . . . . . <br />imatic Conditions <br /> <br />Annual precipitation ... . . . . . . . . . . . . . . . . . . <br />Temperature: <br />Maximum." ,................. '. ... _,.. <br />Minimum......... ........,.."......., <br />Mean ................................'. <br />Growing season.......................... <br />Elevation of irrigable area................. <br /> <br />ENGINEERING DATA <br /> <br />Water Supply <br /> <br />FLORIDA RIVER <br /> <br />Drainage area at Lemon Dam.............. <br />Annnal discharge at Lemon Dam: <br />Maximum (l94Il ................... ..,.. <br />Minimum 119341............,............ <br /> <br />Average,....",... ... ....,'............ <br /> <br />Storage Facilities <br /> <br />LEMON DAM <br /> <br />Type: Rolled earth and rockfill <br />Location: On Florida River, 14 mi north. <br />east of Durango, Colo. <br />Construction period: 1961-63 <br />Reservoir, Lemon: <br />etal capacity....... .................... <br />~tive capacity to El. 8148 ................ <br />Surface area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Dimensions: <br />Structural height......................... <br />Hydraulic height.................. .. ..... <br />Top width. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Maximum base width.. .. ................. <br />Crest length . .... ........................ <br />Crest elevation. ......................... <br />Total volume. . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Spillway: Ungated concrete ogee, approach <br />channel, concrete inlet structure, open con- <br />crete chute, concrete stilling basin, and <br />outlet channel. <br />Crest elevation. . . . . . . . . . . . . , . . . . . . . . . . . . <br />Capacity ............................... <br />Outlet works: 9-ft horseshoe-shaped tunnel, <br />controlled by two 2.25-ft-square high <br />pressure gates. <br />Capacity ............................... <br /> <br />. <br /> <br />14,] mi <br />50 mi <br />15,8 in <br />101 of <br />-38 of <br />46 of <br />112 days <br />7000.0 It <br /> <br />67,6 <br /> <br />mP <br /> <br />143.870 <br />25.170 <br />65,833 <br /> <br />acre.ft <br />acre~ft <br />8cre.ft <br /> <br />40,]46 acre~ft <br />39,030 acre-ft <br />622 acres <br />284 It <br />215 It <br />30 It <br />1,170 It <br />1,360 It <br />8167,0 It <br />3,042,000 yd' <br /> <br />8167,0 It <br />9,600 ftl/s <br /> <br />900 ftl/s <br /> <br />02B4 <br /> <br />Florida Project <br /> <br />Diversion Facilities <br /> <br />FLORIDA FARMERS DIVERSION DAM <br /> <br />Type: Concrete overflow weir, embankment <br />wing <br />Location: On Florida River, about 7 mi east <br />of Durango, Colo. <br />Year completed: (RehuiLtl1963 <br />Dimensions: <br />Height above streambed. . . . . . . . . . . . . . . . . . <br />Weir crest length......................... <br />Weir crest elevation.................. .... <br />Crest length ...... ... ........ ....... ..... <br />Crest elevation .......................... <br />Volume (concrete)........................ <br />Overflow weir capacity.................... <br />Sluiceway: One 10- by 13-ft radial gate. <br />Headworks: One 12.ft-square radial gate. <br />Diversion capacity. . . . . . . . . . . . . . . . . . . . . . . <br /> <br />Carriage Facilities <br /> <br />FLORIDA FARMERS DITCH <br /> <br />Location: Generally southwest from Florida <br />Fanners Diversion Dam in the Florida <br />Mesa area. <br />Construction period: (Enlargement) 1962-63 <br />Length................... ........... ... <br />Diversion capacity. . . . . . . . . . . . . . . . . . . . . . . <br />Typical maximum section in earth: <br />Bottom width............ ....... ........ <br />Side slopes .......................... .... <br />Water depth............................ <br /> <br />FWRIDA CANAL <br /> <br />Location: Generally south from the Florida <br />River in the Florida Mesa area. <br />Construction period: lEnlargement) 1962-63 <br />Length.............................. ... <br />Diversion capacity. . . . . . . . . . . . . . . . . . . . . . . <br />Typical maximum section in earth: <br />Bottom width. . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />Side slopes.............................. <br />Water depth ............................ <br />Lateral system (Reclamation-constructed): <br />Total length . . . . . . . . . . . . . . . . . . . . , . . . . . . . . <br />Capacity range. . . . . . . . . . . . . . . . . , . . . . . . . . <br />Canal rehabilitation (by district): <br />Total length . . . . . . . . . . . . . . . . . . . . . . . . . . , . . <br />Capacity range. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />5 <br /> <br />14 It <br />50 It <br />7075.0 ft <br />630 It <br />7085,0 It <br />700 ydl <br />2,900 ftl/s <br /> <br />185 ft3/s <br /> <br />3,9 mi <br />185 ft3/s <br />12 It <br />2,1 <br />4 It <br /> <br />1.8 mi <br />150 ftl/s <br />10 It <br />2,1 <br />3,8 It <br />14,1 mi <br />2,50 fe/s <br />50 mi <br />3,150 fels <br />