My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00139
CWCB
>
Publications
>
Backfile
>
PUB00139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:43:28 AM
Creation date
9/30/2006 10:23:15 PM
Metadata
Fields
Template:
Publications
Year
1992
Title
Dolores Water Conservancy District Welcomes the CWCB to the Dolores Project
CWCB Section
Water Conservation & Drought Planning
Author
Dolores Water Conservancy District
Description
Plan for Dolores Project (Dolores and San Juan Rivers)
Publications - Doc Type
Historical
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~ <br /> <br />EFFECTS ON COLORADO RIVER AT IMPERIAL DAM <br /> <br />Estimated Stream Depletion (acre-feet/year) <br />Estimated Effect of Salt Loading (mg/l) 3/ <br /> <br />80,900 <br />1.7 <br /> <br />PROJECT COSTS (Oct 1989 prices) <br /> <br />Estimated construction cost <br />Estimated annual operation and maintenance cost <br /> <br />$4SI,763,000 <br />$ 1,936,400 <br /> <br />BENEFITS (Oct. 1989) <br /> <br />Estimated average annual benefits <br /> <br />$17,800,OOO <br /> <br />3/ The 100-year average salt load concentrating effect is I.D mg/l. The <br />concentration diminishes to zero after SO years of the project <br />operation. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.