Laserfiche WebLink
<br />P <br />! <br />i <br /> <br />acre-feet of dead storage. The water surface area totals 4,470 acres at the <br />top of the active capacity at an elevation of 6924.0 feet. The reservoir <br />extends approximately 10 miles up the Dolores River, 4 miles up Beaver Creek, <br />1 mile up Dry Creek, 2 miles up House Creek, and 2 miles across Sage Hen Flats <br />to Great Cut Dike. <br /> <br />DAWSON DRAW DAM AND RESERVOIR <br /> <br />~~-~ <br /> <br />Dawson Draw DamJ to be constructed on Dawson Draw about 9 miles north of <br />Cortez, will be an earth, sand, gravel, and rock structure with a volume of <br />106,OOO cubic yards of material. At a crest elevation of 6556.0 feet, the dam <br />will be 56 feet high, 1,085 feet long, and 30 feet wide. Dawson Draw <br />Reservoir will provide habitat for fish, waterfowl, and other wildlife, and <br />will have a total capacity of 3,310 acre-feet. A surcharge capacity of 2,360 <br />acre-feet will be provided to store floodflows temporarily until they can be <br />discharged over the spillway. Sediments would occupy a volume of 480 acr~- <br />feet after 100 years. <br /> <br />GREAT CUT PUMPING PLANT <br /> <br />Great Cut Pumping Plant at Great Cut Dike houses 14 vertical, mixed-flow <br />pumping units. Eight of the pumps are multistage and lift water from the <br />reservoir through a discharge line into the Dove Creek Canal. The 6 remaining <br />pumps lift water through a discharge line into the .U" Lateral when the <br />reservoir water surface is too low for gravity releases. The annual energy <br />requirement for the Dove Creek Canal pumps is estimated to average 4,300,000 <br />kilowatt-hours, with the "U" Lateral pumps averaging 99,000 kilowatt-hours per <br />year. <br /> <br />PUMPING PLANTS AND LATERALS <br /> <br />l <br /> <br />Five pumping plants, including three along the Dove Creek Canal and two along <br />the South Canal, provide water to seven pipe lateral systems for sprinkler <br />irrigation. Approximately 82 miles of pressurized pipe laterals will deliver <br />over 48,000 acre-feet of water each year to farms in Montezuma and Dolores <br />counties. The average annual energy requirement for operating the pumping <br />plants is estimated to be_ approximately 9,400,000 kilowatt-hours. <br /> <br />DOVE CREEK CANAL <br /> <br />The Dove Creek Canal begins at the end of the pump discharge line at Great cut <br />Pumping Plant and extends northwest 32.8 miles. It has an initial capacity of <br />380 cubic feet per second and a terminal capacity of 46 cubic feet per second. <br />It includes turnouts to the South Canal and to three pumping plants and four <br />lateral systems. <br /> <br />SOUTH CANAL <br /> <br />The South Canal branches off from the Dove Creek Canal near Pleasant View, <br />Colorado and extends for 6.9 miles to the south and west. It has an initial <br />capacity of 150 cubic feet per second and a terminal capacity of 106 cubic <br />feet per second and includes turnouts to two pumping plants and three lateral <br />systems. <br /> <br />2 <br />