Laserfiche WebLink
<br />3.0 <br /> <br />3.1 <br /> <br />3.2 <br /> <br />3.3 <br /> <br />3.4 <br /> <br />Total <br /> <br />Table 4.1 (cont.) <br />Plan <br /> <br />Management Tools <br /> <br />Statewide Area N etworlc for Divisions 1, <br />2 and 3. <br /> <br />Implement a Statewide Database <br />(HydroBase) for all Divisions. Includes <br />water rights, diversions, well permits, <br />dams & stock ponds <br />Planning Tools for Divisions I, 2 and 3. <br />Include Consumptive Use, Water Rights <br />Planning and Ground Water. <br /> <br />Administration Tools for Divisions 2 and <br />3 <br /> <br />(Includes approximately 15% for <br />contingency, de.) <br /> <br />Comment <br /> <br />Communication system required to <br />maintain a centralized data management <br />system. Funding for Divisions 4, 5, 6 & <br />7 is expected to be part of CROSS. <br />All State data except wells were included <br />as part of CROSS in Divisions 4, 5, 6 & <br />7 <br /> <br />Planning tools were developed as part of <br />CROSS in Divisions 4, 5, 6, & 7 and as <br />part of the Kansas v. Colorado litigation <br />in Division 2. However, to use the tools <br />developed in the Kansas case would take <br />some refinement of the models to <br />maintain statewide consistency. <br />An administration tool was developed for <br />Division 1 as part of the SPWRMS. <br />Administration tools are planned as part <br />of CROSS in Divisions 4, 5, 6, & 7. <br /> <br />~ <br /> <br />C 0 s t <br />Estimate <br />($1,000) <br />400 <br /> <br />450 <br /> <br />1,100 <br /> <br />300 <br /> <br />6,400 <br />