Laserfiche WebLink
<br />CWCB FY96 Annual Report, page 28 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4.6 River Rehabilitation Floodplain Management Needs Inventory <br /> <br />The Board recommends it be authorized to expend up to$lOO,OOO from the Construction Fund <br />to develop a scope of work and contract for services to conduct a statewide inventory of river <br />. channel rehabilitation and floodplain management needs. The findings of the needs assessment will <br />be the basis for a proposal to determine the economic feasibility of establishing a statewide <br />floodplain management and river channel rehabilitation program funded separately from the <br />Colorado Water Conservation Board Construction Fund. The proposed program would represent <br />a comprehensive approach and source offunds for local governments to better manage and address' <br />multi-objective river issues including floodplain management, flood hazard mitigation measures, <br />streambank and channel erosion, maintenance of channel conveyance, and wildlife habitat areas. <br /> <br />4.7 Chatfield Reservoir Reallocation Study <br /> <br />The Board recommends it be authorized to expend up to $300,000 from the Construction Fund <br />to cooperate with the Army Corps of Engineers, the Urban Drainage and Flood Control District, <br />interested local governments, and other water users, in a reconnaissance study to be conducted in <br />1997 for the potential reallocation of flood control storage space to municipal water supply storage <br />in Chatfield Reservoir. <br /> <br />The purpose of this reconnaissance study would be to analyze existing and alternative operations <br />of the Chatfield Reservoir individually and, to the extent necessary, systematically with the Cherry <br />Creek and Bear Creek reservoirs, in order to determine the advisability of undertaking a more <br />detailed and more expensive investigation concerning the feasibility of reallocating storage in the <br />flood control pool of Chatfield reservoir, either permanently or on a seasonal basis, to the <br />conservation pool for water supply purposes. The reconnaissance study will estimate potential <br />changes to downstream flows and to reservoir pool elevations as well as the potential consequences <br />to water supplies, flood damages, recreation opportunities, water quality, fish and wildlife habitat, <br />and other resources. <br /> <br />Expenditure of the funds shall be contingent upon the Board receiving a commitment from the <br />corps of engineers that these expenditures, and significant in-kind services provided through the <br />board staff, along with any similar contributions by other non-federal participants, will be recognized <br />and credited appropriately in the negotiated cost share agreement for funding and implementation <br />of a formal feasibility study, should the Board and the Colorado Department of Natural Resources <br />decide to proceed with that level of analysis. <br />