Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CITY OF IDAlia SPRI;';GS. CIIICAGO CREEK RES. OUTLET REIIABILlT A nON <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Chicago Creek Intake Structure Downstream of the Chicago Creek Reservoir <br /> <br />Proiect Description <br /> <br />This project is the rehabilitation of the Chicago Creek Reservoir Darn outlet structure <br />including a new reinforced concrete outlet valve and lift structure, water control gate, and 20 in. dia. <br />steel outlet pipe extension. The project also includes construction of a new dO\\nstrearn intake <br />structure on Chicago Creek delivering reservoir water to the Idaho Springs treatment facility. The <br />project, designed by Arber and Associates of Denver. was awarded to Duckles Construction Co. of <br />Steamboat Springs in December 1996. <br /> <br />Proiect Data <br /> <br />Sponsor: City of Idaho Springs <br /> <br />County: Clear Creek <br /> <br />River: Chicago Creek <br /> <br />Terms of Loan: 5130,000 @4.75% for 3 yrs. <br /> <br />Substantial Completion Dale:Sept.lO, 1997 <br /> <br />Design Engineer-: Arber and Associates, Inc. - Denver, Colorado <br /> <br />ConslructioD Conlradar: Duckles Construction Company. Inc. - Steamboat Springs. Colorado <br /> <br />Design Crileria: <br /> <br />20 in. dia. Concrete encased outlet pipe extension <br />.20 in. Control Gate with .2 in. gate stem and handwheel operator <br />7 ft.. x 13ft. Concrete lntake Structure <br />300 ft. - 12 in. Steel Transmission Line <br /> <br />Annual Volume of \Vater- Delinred b)' Ihe Project: 115 ac.ft. <br />