Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EXCELSIOR IRRIGATING CO. - DIVERSION STRUCTURE REIIABII.lT ATION <br /> <br /> <br />Excelsior Ditch Diversion Intake Structure from the Arkansas Rinr <br /> <br />Ilmiee. Description <br /> <br />This project is the rehabilitation of the Excelsior Ditch including the re-construction of their <br />Arkansas River diversion structure, the rehabilitation of a wastegate/diversion structure along <br />Excelsior Ditch. and the reshaping and regrading of the delivery ditch. The project was designed <br />by Ralph Adkins, P.E. of Pueblo with review by the Natural Resource Conservation Service. <br />Pueblo office. Construction commenced in March by Evans Construction Company of Pueblo. and <br />was completed in August 1997. <br /> <br />Proiect Data <br /> <br />Sponsor: Excelsior Irrigating Company <br /> <br />Counl)': Pueblo <br /> <br />Rinr: Arkansas River <br /> <br />Terms of Loan: $100.000 @3.75% for 30)TS. <br /> <br />Substantial Completion Dale:Aug. 21,1997 <br /> <br />Design Engineer: Ralph Adkins, P.E. - Pueblo, Colorado <br /> <br />Construction Contractor: Evans Construction Company, Inc. - Pueblo, Colorado <br /> <br />Design Criteria: <br /> <br />12 ft. Radial Control Gate (at Arkansas diversion intake) <br />48 in. dia Float Control Well (at wastegate diversion) <br />4ft. x 6ft. Screw Gate (at wastegate diversion) <br /> <br />Annual "olume or\Vater Delinred by the Project: 4,248 ac.ft. <br />