Laserfiche WebLink
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Task No.3 <br /> <br />EVALUATION OF CLOSED BASIN PROJECT EFFECT ON A NEW <br />STORAGE PROJECT <br /> <br />LRCWE review of USBR working paper and <br />preparation of Task Summary Memorandum. <br /> <br />Purpose: Understanding of the operation of the Closed Basin <br />Project by LRCWE is necessary to incorporate the Project <br />impacts into the storable flow analyses. <br /> <br />Task Element No: 3b <br /> <br />Approach: <br /> <br />1. Review of USBR working paper (from Task 3a) and development <br />of preferred procedure for incorporating Closed Basin <br />Project impacts into storable flow analyses. <br />2. Based on USBR working paper, prepare a task summary <br />memorandum describing the Closed Basin Project's background, <br />history, existing and proposed operation. Al so discussed <br />wil1 be the incorporation of the impacts of the Closed <br />Basin Project in the storable flow analyses. <br /> <br />Work Product: A task summary memorandum summarizing the USBR <br />descriptions (background, history, existing and proposed <br />operations) and discussing the incorporation of the Closed <br />Basin Project in the storable flow analyses. This memorandum <br />wi11 be pfo~ided to the CWCB, Sl~WCG, and USBR for fe~iew. <br /> <br />11 <br /> <br />~ Leonard Rice Consulting Water Engineers,lnc. <br />